100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CM 1011 3, 4, 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
26-06-2024
Written in
2023/2024

CM 1011 3, 4, 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Institution
Course








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
June 26, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CM 1011 3, 4, 5
Which of the following is NOT usually one of the bid documents? - ANS-Technical specifications

The competition criteria used to determine the chosen constructor are - ANS-Price
B.Qualifications

Any selection process in which proposals contain both price and qualitative components and the
award is based upon a combination of price and qualitative considerations is - ANS-Best value

Which type of bond guarantees that the payment for a contractor's labor and materials used on
the project will be made? - ANS-payment bond

D.labor and materials payment bond

Public projects have historically been decided by selection of: - ANS-The lowest responsive bid
in conformance with the bid requirements

The part of a design-build proposal that stipulates the price at which the design-builder will
provide the design and construction services necessary to complete the project is: - ANS-Price
proposal

The low-bid selection method involves bidders obtaining plans and specs for review by: -
ANS-The constructor and prospective sub-contractors

Open bidding is required on public projects because _____? - ANS-they are funded by
taxpayers' dollars

A bid or proposal package that meets all of the requirements of the solicitation instrument is a: -
ANS-Responsive bid

The selection methods used for selecting construction and construction management services -
ANS-A.Low-bid
B.Best-value (BVS)
C.Qualifications-based (QBS)

If missing at the bid opining, which one of the below items is cause to reject the bid? -
ANS-A.Sealed envelope
B.Contractor's license
C.Contractor's name
$7.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorHkane Havard School
Follow You need to be logged in order to follow users or courses
Sold
732
Member since
4 year
Number of followers
168
Documents
22458
Last sold
1 day ago

Explore my Stuvia collection for essential study aids: test banks, exams, summaries, and cases. With five years of expertise as an academic writer, I have honed my skills in crafting top-notch essays, exams, and research dissertations. My proficiency lies in producing well-structured and thoroughly researched content that meets academic standards. I am adept at handling various subjects and ensuring a seamless flow of ideas. Whether it's delivering compelling arguments in essays, creating challenging yet fair exam questions, or delving into in-depth research for dissertations, my experience equips me to excel in diverse academic writing tasks. I pride myself on meeting deadlines and maintaining the highest quality in every piece I produce. REACH ON iamnjokikelvin1@gmail

Read more Read less
4.6

386 reviews

5
308
4
29
3
21
2
10
1
18

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions