COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR - answerConstruction manager hired in design phase to assist designer in constructability. CM agrees to Guaranteed max price CM works w owner and architect Design Build - answerOnly one contract - between owner and design-build contractor May be one entity or contractor and architect in a contract. Wasn't allowed for a while most common steel type? a) A529 - 50 KSI b) A36 - 36 KSI - answera) A529 - 50 KSI Weathering steel a)A242 b)A585 c) both - answerc) Both Flag weld symbol meaning - answerField weld (on site) 4 types of envelope construction - answerTilt Wall Stud with veneer Masonry Glass Air/Vapor Barrier is always installed on ___ of wall. - answerInside Roof types - answerBuilt up roofs Single member roofs Metal roofs EPDM Cost Division Self perform groups (5) and %'s - answerTrade Contractors= 70% Self-perform= 15% Taxes= 3% General Conditions= 7% Fees= 5% Cost Division Non-Self Perform groups (4) and %'s - answerTrade contract= 85% Taxes and Bonds= 3% General Conditions= 7% Fees= 5% Buyout - answermoney that is left over when general contractor's estimate is above subcontractor's final price
Written for
- Institution
- Cosc
- Course
- Cosc
Document information
- Uploaded on
- June 24, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cosc 275 exam 2 palmer questions and answers 100
Also available in package deal