100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
21-06-2024
Written in
2023/2024

ACI Concrete Field Testing Technician- Grade I

Institution
Module









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Module

Document information

Uploaded on
June 21, 2024
Number of pages
12
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Concrete Field Testing Technician-
Grade I
A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing
aggregate with particles not exceeding _____ in size, without the need for wet sieving
the concrete. - ANS-2 in. [50 mm]

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. True of False? - ANS-False

A mallet weighing ____ must be used to tap the sides of the bowl after rodding each
layer. - ANS-1.25 +- 0.50 lb. (600 +- 200 g)

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of
False? - ANS-False

A plastic container can be used for the measure in this method. True or False? -
ANS-False, measure must be steel or another suitable metal

According to ASTM C1064, what is one reason to take the temperature of concrete? -
ANS-Verify conformance to a specified requirement for temperature of concrete

After completing the strike-off procedure, what must be done before weighing the
measure and sample? - ANS-Clean off any excess concrete

After consolidation of the final layer, an excess of concrete ____ above the top of the
measure is considered optimum. - ANS-1/8 in. [3 mm]

After molding test specimens, you should wait two hours before moving them to the
location of initial storage. True or False? - ANS-False; the specimens must be moved
immediately

After rodding each layer, what should be done to the measure before adding another
layer of concrete? - ANS-Tap the sides of the measure smartly 10 to 15 times with the
mallet

After the final rodding, the sides of the slump mold should should be tapped lightly with
the tamping rod. True or False? - ANS-False

, After the temperature of the concrete is read, what is required? - ANS-Reporting of
temperature

Air meter bowls used for this test must conform to ASTM _____ and be calibrated for
volumee according to ASTM _____. - ANS-C231, C29

ASTM Method gives standardized requirements for _____, _____, _____, and _____, of
test specimens. - ANS-Making, curing, protecting, transporting

At the end of the procedure, the air meter is _____. - ANS-Disassembled and its
contents examined

Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have
an initial curing temperature between __________. - ANS-68 and 78 degrees F [20 and
26 C]

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site. True or False? - ANS-False

Cylinders made for the purpose of determining when a structure may be put into service
shall be removed from the mold __________. - ANS-At the time of the removal of
formwork

Cylinders that are to be field cured are stored __________ and protected __________. -
ANS-In or on the structure as near to the point of deposit of the concrete represented as
possible; In as near as possible the same way as the formed work

During transportation, test specimens must be protected from damage due to _____,
_____, and _____. - ANS-Jarring, freezing temperatures, moisture loss

Each layer should fill approximately _____ the volume of the mold. - ANS-One-third

Field Curing is the curing method used when test specimens are to be used for
__________. - ANS-Determination of whether the structure is capable of being put into
service; Comparison with standard cured specimens test results or with results from
various in-place test methods; Adequacy of curing and protection of concrete in the
Structure, or Form or shoring removal time requirements

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
topgradesdr Jackson State University
Follow You need to be logged in order to follow users or courses
Sold
1541
Member since
2 year
Number of followers
9
Documents
16559
Last sold
1 week ago
TOPGRADES DOCTOR

Hi there! I'm an experienced academic professional specializing in exam preparation, test banks, and assignments. Whether you're gearing up for a big test, looking for top-notch study guides, or need expertly crafted assignments, I've got you covered. My materials are: Accurate and Comprehensive: Designed to help you excel in your studies. Tailored to Your Needs: Covering various subjects with real exam-style questions and solutions. Time-Saving: Concise, easy-to-understand resources to help you study smarter. Let me help you achieve your academic goals with confidence!

Read more Read less
4.8

288 reviews

5
251
4
22
3
7
2
2
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions