Six Dials of Project Scope -cost -time -quality -safety -scope -function Three-legged-stool -time -cost -quality Design-bid-build Traditional project delivery method -owner holds two separate contracts for design and build Agency CM Cons. Manager acts on the owners best interest but is not financially responsibleGMP Guaranteed Maximum Price Multiple Prime Contracting method where the owner bypasses a General Contractor and enters into multiple contracts with contractors Design-build Newer delivery method where there is only 1 contract between the owner and Design/Builder. Design/Builder is responsible for both ends. Fast-tracking a practice utilized to speed up job by overlapping the design and construction phrase.