ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024
ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024 Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - CORRECT ANSWER-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - CORRECT ANSWER-B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample. Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. A. True B. False - CORRECT ANSWER-A. True ASTM C172 - Para (4.1.2) Q4. If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet sieved before making the test. A. True B. False - CORRECT ANSWER-A. True ASTM C172- Para (6.1) Q5. The composite sample should not be remixed before beginning any tests. A. True B. False - CORRECT ANSWER-B. False ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the minimum amount necessary to ensure uniformity and compliance with the maximum time limits Q6. Sampling should normally be performed, as the concrete is discharged from the mixer. A. True B. False - CORRECT ANSWER-B. False ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the concrete is delivered from the mixer. To the conveying vehicle used to transport the concrete to the forms; however, specifications may require other points of sampling, such as the discharge of a concrete pump. Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. A. True B. False - CORRECT ANSWER-A. True ASTM C172- Para (1.1) Q8. After sampling is completed, start the tests for slump and air content within: A. 2 ½ minutes B. 10 minutes C. 15 minutes D. None of the above - CORRECT ANSWER-D. None of the above ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5 min after obtaining the final portion of the composite sample. Q9. In any case, do not obtain samples until: A. All the water and admixtures have been added to the concrete B. 200 revolutions of the drum have been obtained C. ½ of the water has been added D. None of the above - CORRECT ANSWER-A. All the water and admixtures have been added to the concrete. ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water has been added to the mixe
Written for
- Institution
- ACI
- Course
- ACI
Document information
- Uploaded on
- June 3, 2024
- Number of pages
- 29
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade 1
-
q1 start molding specimens for strength tests wit
-
q2 the maximum allowable time between obtaining t
-
q10 no samples shall be taken before or
Also available in package deal