CAPM - 7TH EDITION EXAM 2024 WITH 100% CORRECT ANSWERS
CAPM - 7TH EDITION EXAM 2024 WITH 100% CORRECT ANSWERS The issues you are facing on your project could have been predicted if a formal risk management process was used. Which document would have been most useful to you along the entire risk management process, from identifying risks to planning and implementing responses to monitoring risks? A Risk register B List of risk triggers C Risk mitigation D Decision tree - correct answer Risk register - A risk register is a repository in which outputs of risk management processes are recorded. Information in a risk register can include the person responsible for managing the risk, probability, impact, risk score, planned risk responses, and other information used to get a high-level understanding of individual risks. There is a complaint from your team that the requirements against which it will work are unclear. What are three criteria that well-defined requirements should meet? (Choose 3) A. Consistent B. Clear and concise C. Verifiable D. Challenging E. Linked with milestones - correct answer A Consistent, B Clear and concise, C Verifiable , - To elicit means to draw out, bring forth, or evoke. There is more to collecting requirements than interviewing or conducting focus groups. Sometimes requirements are drawn out by analyzing data, observing processes, reviewing defect logs, or other methods. Part of eliciting requirements is documenting them and gaining stakeholder agreement. Well-documented requirements meet the following criteria: - Clear. There is only one way to interpret the requirement. - Concise. The requirement is stated in as few words as possible. - V
Geschreven voor
- Instelling
- CAPM - 7TH EDITION
- Vak
- CAPM - 7TH EDITION
Documentinformatie
- Geüpload op
- 1 juni 2024
- Aantal pagina's
- 10
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
capm 7th edition exam 2024 with 100 correct ans