BECC Mod II study guide exam with verified answers
BECC Mod II study guide exam with verified answers Who serves as a Plant Control Officer in the absence of the Engineering Officer? - CORRECT ANSWER-Main Propulsion Assistant Whose duties include overseeing, maintenance of all propulsion, auxiliary machinery and DC Equipment? - CORRECT ANSWER-Engineering Officer Who sis responsible for supervising the Engineering Officer Of the Watch (EOOW) during restricted maneuvering evolutions? - CORRECT ANSWER-Engineering Officer After normal working hours, who is charged with the safe and proper operation of the ships engineering plant in port? - CORRECT ANSWER-Engineering Duty Officer Which Engineering document takes precedence over all others? - CORRECT ANSWER-Night Orders Who is responsible for reviewing the night orders? - CORRECT ANSWER-All Watch Standers In the Engineering Department, what is used to provide guidance in those instances where specific procedures and policies don't already exist, such as casualty steering policy? - CORRECT ANSWER-Engineering Officers Standing Orders The document that is used to modify the Engineering Officers Standing Orders and prolong special evolution is the _________________. - CORRECT ANSWER-Special Operating Orders What is the normal duty of the cold iron watch? - CORRECT ANSWER-Ensure the proper and safe operation of machinery A Cold Iron watch stander is considered properly relieved when the oncoming watch stander has met all of the following requirements EXCEPT: - CORRECT ANSWER-Has permission from the Sounding and Security Watch The Cold Iron watch is NOT responsible for _____. - CORRECT ANSWER-Operating ships generators. Import watches, under normal conditions, follow a predictable rotation of every ___ hours. - CORRECT ANSWER-Fou
Written for
- Institution
- BECC
- Course
- BECC
Document information
- Uploaded on
- May 29, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
becc mod ii study guide exam with verified answer
-
who serves as a plant control officer in the absen
-
which engineering document takes precedence over a
Also available in package deal