OSHA 30 Module 7: Overhead & Gantry Cranes - Correct Crane Steps Exam 100% Solved
OSHA 30 Module 7: Overhead & Gantry Cranes - Correct Crane Steps Exam 100% Solved Inspect to ensure compliance with hoisting and lowering mechanism, trolley travel, bridge travel, limit switches, locking, and safety devices conducting a load test of not more than 125% of rated load. - answer1 To operate the crane, choose only a trained employee knowledgeable about crane operation, hazards, repair, and the standard hand signals for controlling for controlling overhead and gantry cranes. - answer2 Before hoisting, conduct a visual inspection of all functional operating mechanisms, air or hydraulic systems, hooks, hoist ch
Schule, Studium & Fach
- Hochschule
- Osha 30
- Kurs
- Osha 30
Dokument Information
- Hochgeladen auf
- 22. mai 2024
- Anzahl der Seiten
- 1
- geschrieben in
- 2023/2024
- Typ
- Prüfung
- Enthält
- Fragen & Antworten
Themen
-
osha 30 module 7 overhead gantry cranes corre
Ebenfalls erhältlich im paket-deal