100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CGM-C PRE TEST QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
21-05-2024
Written in
2023/2024

The purpose of Construction Quality Management is to: - Answer-Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractor and Government personnel Construction Quality Management is the performance of tasks, which ensure that design and construction is performed: - Answer-According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: - Answer-Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: - Answer-Periodically verify that the contractors system of control is working effectively. An effective contractor quality control (CQC) program will: - Answer-Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: - Answer-The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: - Answer-Require contractors to maintain the quality specified in the plans and specifications. Inspection is: - Answer-The process by which ongoing and completed work is examined During the punch-out inspection of a project: - Answer-Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is disagreement whether the contractor's work complies with the contract: - Answer-The government makes the final determination Characteristics that describe a definable feature of work (DFOW) include: - Answer-Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. - Answer-Follow-up phase The Quality Assurance Plan: - Answer-Is a government management tool establishing staffing, training, pre-award activities, and surveillance activities.

Show more Read less
Institution
CGM-C
Module
CGM-C








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CGM-C
Module
CGM-C

Document information

Uploaded on
May 21, 2024
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
View profile
Follow You need to be logged in order to follow users or courses
Sold
1118
Member since
3 year
Number of followers
880
Documents
18163
Last sold
1 day ago

4.0

208 reviews

5
112
4
41
3
24
2
10
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions