ARE 5.0 – PPD Exam with Complete Solutions 100% Solved
ARE 5.0 – PPD Exam with Complete Solutions 100% Solved SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING - MINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW GROUND 0.3%
Written for
- Institution
- ARE
- Course
- ARE
Document information
- Uploaded on
- May 18, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- are 50 ppd exam
-
with complete solutions 100 solved
Also available in package deal