LEED Green Associate v4: LEED Process Questions and Answers 100% Pass
LEED Green Associate v4: LEED Process Questions and Answers 100% Pass What rating system has a credit category named Smart Location and Linkage? LEED ND What is the proper designation for a project that has earned 80 points and met all prerequisites? LEED Platinum LEED requires which of the following to be done in order for a project to earn certification? Meet the Minimum Program Requirements; Achieve all prerequisites for the rating system A LEED credit that supports local economies and strengthens the green building industry and supply chains supports what impact category? Building a Greener Economy Which of the following are enforceable within the building industry? International Green Construction Code (IgCC) What LEED rating system addresses exterior site maintenance programs? LEED O+M: Existing Buildings What must a project do to earn LEED certification after selecting a rating system? Satisfy all prerequisites for the selected rating system and earn a minimum number of points Who is responsible for ensuring the use of the consensus process to evolve LEED in accordance with the mission, guiding principles, and strategic plan of USGBC? LEED Steering Committee Which of the following defines the types of buildings, spaces, and neighborhoods that the LEED rating system is designed to evaluate? Minimum Program Requirements What part of LEED Online can be used to obtain a real-time snapshot of the project's progress? the project timeline When there are two or more rating systems that might be applicable to a project, how should the project team decide which rating system to use? use the 40/60 rule Which of the following actions can NOT be performed by a project team member using LEED Online? Accessing web-based reference guides What should be used during all project phases to verify the green building goals are being met? LEED project checklist What is the purpose of the LEED Pilot Credit Library? to allow credits to be refined through LEED project evaluations before they complete the balloting process for introduction into LEED What is the point range for a project to earn LEED Silver? 50-59 How does USGBC support achievement of its mission 'to transform the way buildings and communities are designed, built and operated, enabling an environmentally and socially responsible, healthy, and prosperous environment that improves the quality of life'? LEED green building program and Local chapters What are three important factors of the LEED Green Building Rating System? it is voluntary; it is consensus-based; it is market-driven
Written for
- Institution
- LEED Green Associate v4: LEED
- Course
- LEED Green Associate v4: LEED
Document information
- Uploaded on
- May 15, 2024
- Number of pages
- 18
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
leed green associate v4 leed process questions an
Document also available in package deal