100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

BACKFLOW TROUBLESHOOTING QUIZ

Rating
-
Sold
1
Pages
3
Grade
A+
Uploaded on
11-05-2024
Written in
2023/2024

While field testing the check valve of a pressure vacuum breaker, water continues to flow from the # 2 test cock . How do you proceed ? - Answer-Open the bleed off valve until the flow slows to a slight drip. Well field testing the first check valve of a double check valve assembly, water continues to flow from the site tube. How do you proceed? - Answer-Observe reading on gauge (first step). Open high side of bleed valve (second step). While field testing the check valve of a spill resistant pressure vacuum breaker, water continues to flow from the vent valve. What does this imply? - Answer-Number 1 shut off valve is leaking. While field testing the differential pressure relief valve opening point of RP, it is found that the shut - off valve # 2 is leaking . How should the temporary bypass hose be connected to compensate for the leak? - Answer-Test cock # 1 to test cock # 4 While field testing the second check valve of a reduced pressure principle assembly, high side pressure is applied through test cock # 4 and the gage reading begins to increase. How do you proceed? - Answer-Close the # 2 test cock. While field testing the differential pressure relief valve opening point of an RP, the high side control needle valve is open, and the low side control needle valve is open 1/4 turn, however the reading on the gauge will not lower to the relief valve opening point. What does this imply? - Answer-Number 2 shut off valve is leaking What are acceptable field test readings for a properly operating double check valve assembly? - Answer-Check valve number 1: 1.0 PSID and above/ check valve number 2: 1.0 P ID and above When testing an RP, upon closing the number 2 shut off valve and the high and low side bleed valves, the gauge reading drops and differential pressure relief valve begins to discharge. How do you proceed? - Answer-Record the number 1 check valve is leaking and end the test.

Show more Read less
Institution
Backflow
Course
Backflow








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Backflow
Course
Backflow

Document information

Uploaded on
May 11, 2024
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
View profile
Follow You need to be logged in order to follow users or courses
Sold
1140
Member since
3 year
Number of followers
882
Documents
19493
Last sold
14 hours ago

4.0

220 reviews

5
120
4
43
3
24
2
11
1
22

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions