Assisted Living State Article 1 Exam Questions with Complete Solutions 100% Verified Rated A+ 2024/2025
Assisted Living State Article 1 Exam Questions with Complete Solutions 100% Verified Rated A+ 2024/2025 Under R9-10-108, what is the overall time-frame for approval of a health care institution initial license? - Correct Answer 120 Days Under R9-10-108, what is the overall time-frame for approval of a health care institution renewal license? - Correct Answer 90 days Under Subsection (C)(4) of R9-10-108, after an applicant for an initial health care institution license receives the written notice of approval by the Department, within how long should the applicant submit the applicable license fee to the Department? - Correct Answer 60 calendar days Under Subsection (C)(6) of R9-10-108, within how long must an applicant file a written notice of appeal to the Department? - Correct Answer 30 calendar days after receiving the notice of denial Under Subsection of (A)(1) of R9-10-109, how many days shall a licensee ensure that the Department is notified in writing before the effective date of the change affecting the license? - Correct Answer at least 30 calendar days Under Subsection (C) of R9-10-116, what is the overall time frame to approve an application for an approval of a nutrition and feeding assistant program? - Correct Answer 60 calendar days As provided in R9-10-101 (101), which of the following does "infection control"include? - Correct Answer identify, monitor, prevent Under Subsection (A) of R9-10-106, if a project cost for a health care institution is around $100,000 or less, how much would be the architectural drawing fee? - Correct Answer $50 Under R9-10-108, what is the overall time-frame for approval of architectural plans and specifications? - Correct Answer 105 calander days Under Subsection (C)(6) of R9-10-108, within how long must an applicant file a written notice of appeal to the Department? - Correct Answer 30 calendar days after receiving the notice of denial Un
Geschreven voor
- Instelling
- Assisted Living
- Vak
- Assisted Living
Documentinformatie
- Geüpload op
- 9 mei 2024
- Aantal pagina's
- 8
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
under r9 10 108 what is the overall time frame fo
-
under subsection c4 of r9 10 108 after an app
-
under subsection c6 of r9 10 108 within how l
Ook beschikbaar in voordeelbundel