MK1 SWE Exam Review
MK1 SWE Exam Review what are two types of maintenance - Corrective and preventative What article always captain to conduct NJP - Article 15 Where two types of procedures that may be accessed from maintenance procedure option - Official and local Who is authorized to conduct tag outs - Authorizing officer Out of calibration tags should be used when - When indicating parameter errors are small and consistent For modernized units the boat inspection reports are to be entered through - Almis/ EALpage Cutter engineering report shall be completed in accordance with - Naval engineering manual chapter 90 On an MPC the warning shall come where in the text - Before the instruction On an MPC what would constitute an expendable - Rags PMS that does not need to be included in the cutter engineering report is - Daily and weekly With regards to casreps what is mandatory on all updates corrects and cancellations - REF Which unit besides a shore unit are exempt from filling out the POSIT line - Cutter underway A casrep it should be made as soon as possible no later than ____hours - 24 Casualties that effect a secondary mission should always have a casualty category of - 2 AMPN is mandatory after any set that contains an entry of? - Other, tech, none In a 1PARTSID if the NIIN is not known what needs to be put in the line - Unknown What is the criteria for submitting CASCOR - The delay expressed an hours, and correcting the casualty due to parts unavailability, a list of all parts requested and dates received; the total number of man-hours expanded; the number of equipment hours since last failure You find something else wrong with the piece of equipment that has already been CASREP'd you should send an? - Update Where do you find the hierarchy of guidance for specification plans - NEM chapter 41 Which specifications may be used as a guided researching propose engineering changes and solutions - GSO Which specification do not apply to construction, alteration or maintenance of Coast Guard cutters - Commercial general specifications for t-ships Where do you find the authorized material list for deck coverings - Naval engineering manual chapter 634 110 - WPB - 521-01, what does 5 21 represent - SW BS number Enthusiasm for realistic drills must outweigh sound judgment, or sound evaluation of the______ - State of the crew Casualty control is used for what type of casualties
Geschreven voor
- Instelling
- MK1 SWE
- Vak
- MK1 SWE
Documentinformatie
- Geüpload op
- 4 mei 2024
- Aantal pagina's
- 17
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden