100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+

Rating
-
Sold
2
Pages
8
Grade
A+
Uploaded on
03-05-2024
Written in
2023/2024

MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. Where shall the hand signals for the machine in use be posted: On the job site 2. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires in 1 lay 5. When shall wire rope be taken out of service if used as a running line for hoisting: Three broken wires in one rope lay 6. What is the major reason for mobile crane accidents:  Improper crane setup 7. What happens to the jib capacity as the jib angle to the ground increases: - Increases 8. When first lifting the boom off the ground, which position should the gantry be in?: Highest MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Scored A+ 2 / 7 9. When dismantling a lattice crane boom which pins should be removed first: Bottom 10. The distance from the center rotation of the crane the the center of a freely suspended hoist line is called: Radius 11. What is it called when the ultimate strength of an object is divided by the safe working load for that object: Safety factor 12. The point about which a crane tips is called: Tipping axis 13. Which percentage of tipping is a crawler crane's stability rated at: 75% 14. On a lattice boom crane what is a fixed A frame called that is located at the top of the superstructure which has the boom cable attached to it: Gantry 15. On a lattice boom crane what is a pivoting a frame which is at the base of the boom and has a fixed angle with the boom called: Live mast 16. When a load is lifted from the ground, what happens to the loads center of gravity: It will move directly under the boom point sheave 17. When contact has been made with an electrical power line, what should the operator do first: Try to break contact

Show more Read less
Institution
MA Hoisting License 1B
Course
MA Hoisting License 1B









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MA Hoisting License 1B
Course
MA Hoisting License 1B

Document information

Uploaded on
May 3, 2024
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1. Where shall the hand signals for the machine in use be posted:  On the job site 2. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires in 1 lay 5. When shall wire rope be taken out of service if used as a running line for hoisting: Three broken wires in one rope lay 6. What is the major reason for mobile crane accidents:  Improper crane setup 7. What happens to the jib capacity as the jib angle to the ground increases: - Increases 8. When first lifting the boom off the ground, which position should the gantry be in?: Highest MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Scored A+ 9. When dismantling a lattice crane boom which pins should be removed first: Bottom 10. The distance from the center rotation of the crane the the center of a freely suspended hoist line is called: Radius 11. What is it called when the ultimate strength of an object is divided by the safe working load for that object: Safety factor 12. The point about which a crane tips is called: Tipping axis 13. Which percentage of tipping is a crawler crane's stability rated at: 75% 14. On a lattice boom crane what is a fixed A frame called that is located at the top of the superstructure which has the boom cable attached to it: Gantry 15. On a lattice boom crane what is a pivoting a frame which is at the base of the boom and has a fixed angle with the boom called: Live mast 16. When a load is lifted from the ground, what happens to the loads center of gravity: It will move directly under the boom point sheave 17. When contact has been made with an electrical power line, what should the operator do first: Try to break contact 18. When the values fall between the ratings shown on the load chart for radius, what rating should be used: Next longer radius 19. On a crawler crane what should the operator do if the load weight is not

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcelAcademia2026 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2059
Member since
4 year
Number of followers
1648
Documents
7476
Last sold
2 days ago
EXCEL ACADEMIA TUTORS

At Excel Academia Tutoring, You will get solutions to all subjects in both assignments and major exams. Contact me for assistance. Good luck! Well-researched education materials for you. Expert in Nursing, Mathematics, Psychology, Biology etc. My Work has the Latest & Updated Exam Solutions, Study Guides and Notes (100% Verified Solutions that Guarantee Success)

3.7

337 reviews

5
139
4
74
3
62
2
19
1
43

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions