Army Risk Management Questions And Answers.
What is the definition of Risk Management? - Answer-The Army's primary decision making process, used by employees and managers, for identifying hazards and controlling risks Which of the following represents a principle of risk management? - Answer-Risk management must be integrated into operational missions What is a Risk Assessment Matrix? - Answer-A matrix that defines the level of risk based on the probability and severity of a hazardous event. What is the five step process? - Answer-Identify hazards, assess hazards, develop controls and make risk decisions, implement controls, supervise and evaluate What are the factors that cause accidents? - Answer-Environment, human, materiel What are the three basic categories of control? - Answer-Educational/awareness, physical, hazard elimination How do you implement controls? - Answer-Ensure controls are communicated to those involved in the activity. Once controls are implemented, how do you supervise and evaluate? - Answer-You make on the spot corrections. What is probability? - Answer-The likelihood of an event taking place. What is severity? - Answer-the expected consequences of an event in terms of injury, property damage, or other mission-impairing factors What is a risk? - Answer-The chance of something going wrong, resulting in injury, damage, or lossWhat is a risk decision? - Answer-A decision based on what constitutes an acceptable level of risk. In which step of the five steps RM process is the METT-TC analysis conducted? - Answer-Identify hazards Situation: Your roommate, who works with you, just received some bad news that his engagement is off. He seems very depressed, and after drinking heavily he gives some of his cherished possessions to you. What action do you take? - Answer-Notify your supervisor. What type of error or factor is the leading cause of accidents? - Answer-Human How do you identify hazards? - Answer-You observe an actual or potential condition, situation, or event that can result in injury What does DRAW stand for? - Answer-Deliberate Risk Assessment Worksheet Deliberate Risk Assessment Worksheet - Answer-DD Form 2977 Who approved the DRAW? - Answer-The Commander
Geschreven voor
- Instelling
- Army Risk Management
- Vak
- Army Risk Management
Documentinformatie
- Geüpload op
- 30 april 2024
- Aantal pagina's
- 2
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
Ook beschikbaar in voordeelbundel