ACI 84 Test Questions With Correct Answers
The total time allowed between obtaining the first and final portions of a composite sample is - ️️15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - ️️F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - ️️5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - ️️15 minutes The concrete samples should be protected from - ️️the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - ️️28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - ️️T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - ️️2 or more Wet sieving is performed - ️️when the concrete contains aggregates larger than appropriate for a test
Written for
- Institution
- SFP - Sustainability Facility Professional
- Course
- SFP - Sustainability Facility Professional
Document information
- Uploaded on
- April 29, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers