{2024} Questions with Correct
Answers
How to power on OIU & purpose? - Answer - -Press the power button
-Configure & monitor
-Select parameters (KIV-7M OIU)
KIV-7M power on procedure? - Answer - -Set power switch to ON. Confirm success
when KIV preforms self-test that ends with command/ status display reading -status
During terminal shutdown, everything is terminated except? - Answer - -PPI and AG
Radome Heater
How many login attempts are there? - Answer - -5
Who can establish comms on the CRK? - Answer - - User & admin
What is a CRK used for? - Answer - -Allows us to access/use crypto device
What does not require black keys? - Answer - -SHF WGS
What TOD is normally selected? - Answer - -Mil GPS
What deals with signal handling? - Answer - -Block up converter (BUC)
What do you need before powering up the CBSP? - Answer - -SAA
What is the first step of shutting down the CBSP? - Answer - -Deactivate the ULV BDE
power
What allows operators to configure Tx and Rx signals ? - Answer - -Local Control
Terminal (LCT)
What is the purpose of baseband port mapping? - Answer - -Allows services to be
mapped to multiple ports