100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDFM Module 4 Complete Questions With 100% Verified answers

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
24-04-2024
Written in
2023/2024

CDFM Module 4 Complete Questions With 100% Verified answers What is JCIDS (Joint Capabilities Integration and Development System)? assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? Materiel Development Decision What are the two steps in pre-systems acquisition? Materiel solution analysis and technology development Which milestone is the program initiation? Milestone B The MDA may authorize entry into the acquistion system at any point? True or False True What are the most expensive programs? ACAT IA Who is the single point of accountability for accomplishing program objectives? program manager What says the DOD may not obligate funds for a major defense acquisition program after the program enters the Engineering and Manufacting phase? 10 USC 2435 What is systems engineering? overarching process that a program team applies to transition from a stated capability need to an operationally suitable system. It is the integrating mechanism across the technical efforts Program managers prepare a _________ for each milestone review, beginning with Milestone A. Systems Engineering Plan (SEP) Integrated Product and Process Development (IPPD) is mgmt technique that simultaneously integrates all essential acquisition activities through the use of multidisciplinary teams to optimize design, manufacturing and supportability processes. What are the 3 levels of IPT's Overachring Integrated Product Team (OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT), and Working Level Integrated Product Team (WIPT) that advise the PM What are the 8 technical management processes? 1. Decision Analysis 2. Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk Management 6. Configuration Management 7. Data Management 8. Interface Management What is decision analysis? provide the basis for evaluating and selecting alternatives SEP is a mandated tool for this activity Technical planning _______ measures technical progress and the effectiveness of plans and requirements technical assessment What maintains the traceability of all requirements from needs? requirements management _________ is an audit trail of decisions and design modifications configuration management What answers the question of "did you build it right"? verification What answers "is this the right solution"? validation What is a system of system engineering? satisfy capabilities thru multiple and interacting systems. Not to be confused with a "family of systems" What is the formal entry point into the acquisition process? Material Solution Analysis Phase What is not a decision point but opens the gate if all criteria has been met? MDA Which pases enters approved ICD and study guidance for conducting AOA and is guided by ICD and AOA plan? materiel solution analysis phase Which phase reduces technology risks, determine and mature the appropriate set of technologies to be integrated into a full system and to demonstrate critical technologies on prototypes? technology development phase The MDA for an MDAP, without the authority to delegate, shall sign a certification memorandum for record prio to ______________? Milestone A What follows the completion of technology development? Milestone B decision The purpose of the _____________ phase is to develop a system or an increment of capability; complete full system integration; develop an affordable and executable manufacturing process; ensure operational supportability with particular attention to minimizing the logistics footprint EMD (Engineering and Manufacturing Devlopment) Prior to beginning the ____________, users shall identify and the requirements authority shall approve a minimum set of key performance parameters (KPPs), included in the CDD, that guides the efforts of this phase. EMD EMD begins at _______________? Mileston B which is normally the initiation of an acquistion program At ______________, the MDA approves updated acquisition strategy and APB, entry into LRIP, exit criteria for LRIP if appropriate and an Acquisiton Decision Memorandum Milestone C What is the purpose of the production and deployment phase? achieve an operational capability that satisfies mission needs An MDAP may not proceed beyond LRIP without ___________? MDA approval What uses widely supported and consensus based standards for its key interfaces, and is subject to validation and verification tests to ensure the openness of its key interfaces? Open Systems Design What is commercial-off-the-shelf items (COTS)? maximum use of mature technology provides the greatest opportunity to hold fast to program cost, schedule, and performance requirements and is consistent with an evolutionary acquisition strategy Reliability, Availability and Maintainability (RAM) based on the initial capabilities document or capability development document and total ownership cost (TOC) considerations, and states them in quantifiable, operational terms, measurable during DT&E and OT&E 5000.01 requires the program manager to pursue _______ initiatives in order to optimize total system performance and minimize total ownership cost Human Systems Integration (HSI) The program manager should incorporate ______________ requirements into program design activities to ensure availability, integrity, authentication, confidentiality, and non-repudiation of critical system information information assurance What identifies and safeguards selected DoD research and technology anywhere in the RDT&E or acquisition process to include associated support systems Research and technology Protection (RTP) What is Item Unique Identification (IUID) identifies and tracks applicable major end items What should guide all technical aspects of an acquisition program? Systems Engineering Plan (SEP) When should a SEP be prepared? beginning with Milestone A What is an essential element of the systems engineering process? modeling and simulation Affordability assessments are typically conducted by _______________ in the DOD component headquarters or supporting organization resource analysts What balances cost versus performance in establishing key performance parameters? program affordability For MDAP and MAIS programs, affordability assessments are required at? Milestones B and C What is required as part of the entrance criteria for the transition into the EMD phase at Milestone B? full funding These are an example of what: set cost goals, perform trade-off studies, establish cost performance integrated product team, provide incentives and establish metrics CAIV (Cost as an independent variable) PM has no control over _______________ total ownership cost

Show more Read less
Institution
CDFM - Certified Defense Financial Manager
Course
CDFM - Certified Defense Financial Manager









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDFM - Certified Defense Financial Manager
Course
CDFM - Certified Defense Financial Manager

Document information

Uploaded on
April 24, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Topscorer1 South University
View profile
Follow You need to be logged in order to follow users or courses
Sold
247
Member since
4 year
Number of followers
207
Documents
7292
Last sold
2 weeks ago
TOPSCORER1

Expert Study Solutions | Nursing, Business, Accounting & More! Looking for top-quality study materials to excel in college or university? You're in the right place! I provide highly graded, almost A+ solutions across various subjects, including Nursing (my main expertise), Business, Accounting, Statistics, Chemistry, Biology, and many more. ✅ Accurate & Well-Researched Guides ✅ Comprehensive Solutions for Better Grades ✅ Student-Friendly Approach & Full Support ✅ Satisfaction Guaranteed – Refund Available if Not Satisfied I’m committed to helping students succeed by providing reliable, high-quality academic resources. Let’s boost your grades together!

Read more Read less
3.8

40 reviews

5
22
4
5
3
4
2
0
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions