Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

IT Project Management Exam 1 Questions and Answers 100% Pass

Note
-
Vendu
-
Pages
20
Grade
A+
Publié le
22-04-2024
Écrit en
2023/2024

IT Project Management Exam 1 Questions and Answers 100% Pass What is the name of PMI's organization maturity model for project management that helps to determine the level of ability of an organization to deliver the desired strategic outcomes in a reliable, controllable, and predictable manner? a. ISO 9000 b. OPM3 - Project Process Management 3 c. Project management maturity model d. Six Sigma - Correct Answer ️️ -b. OPM3 - Project Process Management 3 Success in portfolio management, which can be generally described as a group of projects or programs and other works to achieve a specific strategic business goal, is generally defined as: a. Aggregate performance of all components (projects, programs and other related work) b. Control of changes to specific products and services c. Compliance with schedule, budget and specification requirements d. Realization of the business benefits and financial objectives - Correct Answer ️️ -a. Aggregate performance of all components (projects, programs and other related work) Which one of the following is the logical breakdown of what needs to be done to produce the project objectives sometimes referred to as the performing organizations methodology for projects? a. Product life cycle b. Project life cycle c. Feedback loop d. Product development - Correct Answer ️️ -b. Project life cycle The application of knowledge, skills, tools, and techniques to satisfy the project needs by establishing project objectives, identifying project requirement, managing stakeholders and balancing project constraints (i.e. cost, time, quality, scope risk and others) is referred to as: a. Project management b. Project administration c. Project initiation d. Project coordination - Correct Answer ️️ -a. Project management All project phases conclude with a review of the deliverables and related work (phase exits or stage gates or kill points) for the purpose of: a. Determining if the project should continue and the next phase should be initiated b. Determining defections and correcting errors c. Assessing project risks d. Enforcing formal control procedure of the project - Correct Answer ️️ -a. Determining if the project should continue and the next phase should be initiated A project life cycle is a representation of the generally sequential and sometime overlapping project phases that a project typically goes through. All of the following statements about project life cycle are true EXCEPT: a. Cost and staffing start low, increase toward the end, and drop Rapidly near closing b. Project risk is highest at the beginning of the project and reduces as the project approaches its end c. Stakeholder influence is lowest at the start and increases as the project proceeds d. Cost or changes is low in the beginning but extremely high late in the project. - Correct Answer ️️ -c. Stakeholder influence is lowest at the start and increases as the project proceeds You are managing a group of related or unrelated projects or programs and other works to achieve specific strategic business objectives and goals. You are a: a. Program owner b. Project manager c. Program manager d. Portfolio manager - Correct Answer ️️ -d. Portfolio manager Which one of the following PMO structures mostly provide guidelines, policies and template and requires compliances and usually has a moderate level of control over project and programs? a. Supportive b. Controlling c. Directive d. Constructive - Correct Answer ️️ -b. Controlling The level of power and authority of a project manager may fluctuate due to various factors, Typically, how much power and authority a project manager will have depends on which of the following? a. The organizational structure b. The negotiation skills of the project manager c. Project management knowledge and technical competency of the project manager d. The relationship of the project manager with senior management especially with the sponsor - Correct Answer ️️ -a. The organizational structure You are the managing a group of related projects to accomplish a common objective. You are a: a. Program owner b. Project manager c. Program manager d. Portfolio manager - Correct Answer ️️ -b. Project manager Which of the following will only during the Planning Process Group? a) Identify stakeholders b) Develop schedule c) Acquire resources d) Validate scope - Correct Answer ️️ -b) Develop schedule A knowledge Area represents a complete set of activities, concepts, and terms that make up an area of specialization, project manage

Montrer plus Lire moins
Établissement
Information Technology Project Management
Cours
Information Technology Project Management










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Information Technology Project Management
Cours
Information Technology Project Management

Infos sur le Document

Publié le
22 avril 2024
Nombre de pages
20
Écrit en
2023/2024
Type
Examen
Contient
Questions et réponses

Sujets

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
EmilyCharlene Teachme2-tutor
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
461
Membre depuis
2 année
Nombre de followers
138
Documents
21946
Dernière vente
14 heures de cela
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

99 revues

5
46
4
14
3
15
2
7
1
17

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions