CDT Exam Questions With 100% Correct Answers 2024 Who is part of the project team? - answerOwner, Designer, Contractor, Supplier Responsibilities of the Owner - answerinitiates project and assumes risk Responsibilities of the Designer - answerplanning, reflects owner's vision, codes and regulations, construction documents, contract, QA/QC Responsibilities of the Contractor - answerestimates cost, time, manages construction Responsibilities of the Supplier - answerproduce equipment, products, and materials Four C's of Communication - answerClear, Concise, Correct, Complete Stages of the Facility Life Cycle - answer1. Project Conception 2. Design 3. Construction Documents 4. Procurement 5. Construction 6. Facility Management Four Considerations to be Identified in Facility Programming - answerfunction, form, economy, time Service Life Definition - answerperiod in which a structure remains usable for an intended purpose Factors Affecting Built Element Performance - answeramenity and comfort, durability, health and safety, structure, operational maintenance Types of Studies and Investigations - answerexisting facility evaluation, hazard materials evaluation, geotechnical investigation, environmental studies, archeological studies, community impact studies, financial studies What are hard costs? - answertangible costs (construction) What are soft costs? - answernon-tangible costs (design, plans, specs) Types of bonds - answerbid bonds, performance bonds, payment bonds Project schedule VS Construction schedule - answerProject schedules are developed during project conception and address items such as programming, site studies and acquisition, design and other activities. Construction schedules are developed by the contractor and are one part of the overall project schedule. Methods technique (used to develop project schedules) - answerestablishes required date of occupancy or use, identifies all preceding milestone dates by working backward Critical path method (used to develop project schedules) - answerdetermines activities that are dependent on each other, determines longest path for completion of those activities Examples of Due Diligence - answerhazardous material evaluation, geotechnical investigations, environmental studies, archeological studies, community impact studies What do site surveys show? - answerproperty lines, topographical contours, benchmarks, spot grade elevations, adjoining street, existing structure, fences and walls, location of soil contamination, easement and row, zoning classifications, location of flood plain, location of trees, description and location of natural features, encroachments definition of easement - answerrestrictions, property containing easements is owned by the owner but buildings cannot be built on that portion of the property types of commissioning - answertotal project, systems and equipment, building envelope definition of commissioning - answerquality oriented process that achieves, verifies, and documents performance of facilities, systems, and assemblies 3 principles of the commissioning process - answerdetermining project performance requirements, planning the commissioning process, document compliance and acceptance 3 factors of quality - answercost, extent, and time project management options - answerconstruction manager as agent, construction manager as advisor, program management Selection of an A/E - answerdirect selection, qualifications based, fee based, design competitions Selection of Contractor - answerlowest bid, best value/fee, qualifications based, best value/total cost definition of partnering - answerconcept of teamwork, team participants set priorities and goals to ensure cooperative efforts definition of collaboration - answerreflects need to work together cooperatively, may be as simple as people working together as a team

Meer zien Lees minder
Instelling
CDT
Vak
CDT









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CDT
Vak
CDT

Documentinformatie

Geüpload op
14 april 2024
Aantal pagina's
10
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Fyndlay Kaplan University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
358
Lid sinds
1 jaar
Aantal volgers
80
Documenten
18668
Laatst verkocht
3 dagen geleden
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 beoordelingen

5
32
4
8
3
13
2
6
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen