Neiep 810 Piping and Temporary Jack questions with answers
Neiep 810 Piping and Temporary JackPump, motor and control vales - correct answer The Basic power unit consists of a reservoir, a________ , _______,and ________ Direct Coupled - correct answer Conventional pumps are usually belt driven, while submersible pumps are always ________ Adjacent to the hoist way at the lowest landing - correct answer The ideal location for the machine room on a hydraulic installation is ___________ Call your superintendent - correct answer If it becomes necessary to dismantle the power unit in order to get it into the machine room, the first thing you should do is ________ Main line Disconnect, Moor starting relays, Pump motor - correct answer The heaviest wires in the machine room run from the _____ to the ______ and the ______ Buried in a trench - correct answer On jobs where the machine room is located at the lowest floor byt is not adjacent to the hoistway, the oil line is often _______ Welded - correct answer Concealed oil lines are often ______ at the fittings Friction Loss - correct answer Ells increase ______ in the oil line Silencing Muffler - correct answer A _______ may be required to minimize the effect of any pulsations in the pump output Supported - correct answer When the oil line is completed, it is very important that it be adequately _______ ASME code - correct answer The specifications for pipe and fittings to be used in hydraulic installations
Written for
- Institution
- Neiep
- Course
- Neiep
Document information
- Uploaded on
- April 14, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
neiep 810 piping and temporary jack
Also available in package deal