100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Naslca Virginia Exam Practice Questions With Correct Answers 2024

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
12-04-2024
Written in
2023/2024

Naslca Virginia Exam Practice Questions With Correct Answers 2024 What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - answer$500 fine per day for each day of violation plus penalties for a misdemeanor. All Class A contractor licensure applications MUST include - answerinformation on the knowledge, skills, and abilities of the applicant. What is the PRIMARY purpose of licensing? - answerProtect the health and welfare of the public. When a claimant is paid funds from the Contractors Recovery Trust Fund - answerthe contractor's license is revoked. !!! The application for licensure MUST include - answerthe business address of the proposed designated employee. Which of the following is a requirement for a joint venture? - answerEither the joint venture or each contracting party of the joint venture must be licensed. All of the following must be licensed EXCEPT - answera material supplier who advises a contractor. How much is the Class A initial license fee? - answer$200 A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - answer30 days According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - answer30 hours. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - answer$15,000. According to the Board Rules and Regulations, which of the following could be a qualified individual? - answerAny full-time employee. An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? - answer90 days. A building official MUST issue a certificate of occupancy for a building that meets all the requirements for a certificate within a MAXIMUM of how many working days after the certificate was requested? - answer5 Additions to buildings MUST comply with - answerthe current code for new construction. When MUST the work be stopped following the issuance of a stop work order? - answerImmediately Who is to be in charge of a local building department? - answerBuilding official. Contractors who are assessed a fee to support the Transaction Recovery Fund MUST pay this fee within a MINIMUM of how many days from when the assessment fee notice was mailed? - answer45 days Contractors will be assessed a fee for the Transaction Recovery Fund whenever the fund balance is less than - answer$400,000. Payments made by the Transaction Recovery Fund to claimants may include an amount for - answerattorneys' fees. A contract for which of the following types of structures may be subject to recovery from the Transaction Recovery Fund? - answerResidential only. A verified claim for payment from the Transaction Recovery Fund MUST occur within a MAXIMUM of what period of time from the date the claimant was awarded a final judgment? - answer12 months. An appeal of a final decision of a county on an erosion control plan MUST be filed within a MAXIMUM of how many days? - answer30 days. Temporary erosion and sediment control measures MUST be removed within a MAXIMUM of how many days after the final site stabilization? - answer30 days. Which of the following statements about a sole proprietorship is TRUE? - answerThe business, or any part of it, can be sold, altered, or exchanged at will. What type of business organization allows people to share financial resources? - answerPartnership. Which of the following estimating methods is typically used by the architect rather than the contractor? - answerConceptual estimate. Equipment needs for a project are BEST estimated by - answercalculating the number of hours or days it is needed. What should be added to wage rates to ensure accuracy in estimating labor for a project? - answerLabor burden. A reason for using a lower than usual profit markup for a specific project could be to - answercover company overhead costs. Which of the following is a TRUE statement about estimating? - answerBoth overestimating and underestimating costs could have disastrous consequences. A contractor should do all of the following when estimating a project EXCEPT - answerassume ideal conditions What MUST be included in an estimate for a job? - answerMaterials, labor, equipment, and overhead costs. Costs that relate to construction activity but are NOT easily identifiable for a specific project are considered - answerproject overhead. All of the following are considered general conditions that could affect costs directly associated with a specific project EXCEPT - answerprofit margin The two basic laws of construction estimating are - answerlow estimates decrease profits and high estimates decrease volume. An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a - answercost plus contract. Generally, who is responsible for ensuring that a project meets all zoning requirements? - answerProject owner. A bid that does NOT specifiy how long it remains open or in effect is considered to be open for - answera reasonable amount of time. A contractor is about to sign an agreement with a representative of a corporation. The contractor should - answerverify that the representative has the authority to bind the corporation. What may be covered by an allowance in a contract? - answerLight fixture costs The prime contractor is one who - answeris responsible for the overall construction of the project.

Show more Read less
Institution
Naslca Virginia
Course
Naslca Virginia









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Naslca Virginia
Course
Naslca Virginia

Document information

Uploaded on
April 12, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
347
Member since
1 year
Number of followers
80
Documents
18286
Last sold
2 hours ago
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

67 reviews

5
31
4
8
3
13
2
6
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions