Random CMCA Practice Test Questions (Under Construction) With Verified Answers By Experts
A. A purchase order system B. An equipment warranties C. A work order/response form D. A contractor's invoice C. Maintenance responsibility chart along, with the governing documents, defines parameters of association maintenance responsibility. The other answers have no bearing on necessity of maintenance or maintenance responsibility. - ANSWER-The primary management control tool for identifying whether the association needs to maintain a particular property element is: A. Physical inspections B. Association bylaws C. Maintenance responsibility chart D. Community asset inventory B. Re-roofing the buildings - Large contracts involving significant material purchase and/or use of sub-contractors commonly include lien waivers and should be recommended to the board. A, C, and D typically do not include significant material purchases or the use of sub-contractors so a waiver of lien is not necessary. - ANSWER-In what type of a contract would a waiver of lien by recommended? A. Repair of the HVAC system B. Re-roofing the buildings C. Repair of the pool pump D. Annual tree pruning B. Maintain certain limits of insurance - Co-insurance seeks to the limits of insurance in place at the time of a loss and speaks to insurance obligation for the parties involved in the claim.
Written for
- Institution
- Random CMCA Practice (Under Constru
- Module
- Random CMCA Practice (Under Constru
Document information
- Uploaded on
- April 12, 2024
- Number of pages
- 20
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
random cmca practice test questions under constru
-
random cmca practice test questions stuvia
-
c a work orderresponse form a b and d speak
Also available in package deal