NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+ Overhead cranes with more than one hoisting unit shall have what? - Correct Answer its rated load marked on it What is the purpose of the "E" (Emergency) stop on an overhead crane? - Correct Answer removes power to entire crane How often does O.S.H.A. require a written wire rope inspection? - Correct Answer once a month Most loads should be rigged to within how many degrees of level? - Correct Answer five According to ASME B30.2, what is the safety factor for rigging? - Correct Answer 5 to 1 According to O.S.H.A. frequent Inspections shall be performed when? - Correct Answer daily to monthly According to ASME B30.2 a frequent inspection must be performed by a? - Correct Answer designated person According to ASME B30.2, the maximum twist of the hook can't exceed? - Correct Answer 10 degrees When inspecting electrical contacts, what are the signs they are bad? - Correct Answer pitted or burned According to ASME B30.2, what type of fire extinguisher is required for overhead cranes? - Correct Answer 10BC Before leaving an overhead crane unattended, attached loads should be? - Correct Answer lowered to the floor Before using your hand to steady any load, you should? - Correct Answer follow company policy According to OSHA, the rated capacity of all overhead
Written for
- Institution
- NCCCO Crane
- Course
- NCCCO Crane
Document information
- Uploaded on
- April 11, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
overhead cranes with more than one hoisting unit s
-
what is the purpose of the e emergency stop on
-
how often does osha require a written wire rop
-
most loads should be rigged to within how many deg
Also available in package deal