P370 Final Exam Questions With Correct Solutions. Aggregate Production Planning Section 8 Questions: 6 Conceptual 2 Quantitative Aggregate Production Planning (APP) A managerial statement of time-phased production rates, workforce levels, and inventory investment, which takes into account customer requirements and capacity limitations. APP..... Helps you attain in the best way possible the objective(s) set. Characteristics of Aggregate Production Planning 1. Aggregate 2. Time Horizon 3. Time Buckets 4. Rolling Horizon 5. Nature of Business determines time breakdown Aggregate 1. Classes of Products 2. Labor or other inputs 3. Geographic location of production 4. Often fictitious Time Horizon medium term Time Buckets divisions of horizons Nature of Business determines time breakdown typically one year with one months buckets Lower Levels of Planning 1. Master Production Scheduling (MPS) 2. Material Requirements Planning (MRP) 3. Shop Floor Scheduling Master Production Scheduling (MPS) 1. 1st level of disaggregation 2. Break-down into more real end-items 3. Typically Shorter time horizon (never longer) and finer buckets than APP 4. Typically implemented on rolling horizon

Show more Read less
Institution
Course

Content preview

P370 Final Exam Questions With Correct
Solutions.
Aggregate Production Planning Section
8 Questions:
6 Conceptual
2 Quantitative


Aggregate Production Planning (APP)
A managerial statement of time-phased production rates, workforce levels, and inventory investment,
which takes into account customer requirements and capacity limitations.


APP.....
Helps you attain in the best way possible the objective(s) set.


Characteristics of Aggregate Production Planning
1. Aggregate
2. Time Horizon
3. Time Buckets
4. Rolling Horizon
5. Nature of Business determines time breakdown


Aggregate
1. Classes of Products
2. Labor or other inputs
3. Geographic location of production
4. Often fictitious


Time Horizon
medium term


Time Buckets
divisions of horizons


Nature of Business determines time breakdown
typically one year with one months buckets


Lower Levels of Planning
1. Master Production Scheduling (MPS)
2. Material Requirements Planning (MRP)
3. Shop Floor Scheduling


Master Production Scheduling (MPS)
1. 1st level of disaggregation
2. Break-down into more real end-items
3. Typically Shorter time horizon (never longer) and finer buckets than APP
4. Typically implemented on rolling horizon

, 5. Formulated at lower organizational level than APP due to greater frequency of revision and greater
specificity.


Material Requirements Planning (MRP)
Extreme detail, down to each nut and bolt


Shop Floor Scheduling
detailed, actual production schedule


Three Pure Aggregate Plans:
To meet changes in demand
1. Chase
2. Level
3. Stable Workforce


Characteristics of Three Pure Aggregate Plans
1. Are three generic strategies that represent extremes on a continuum.
2. Most commonly companies implement plans that fall in the middle of these strategies


Chase
production and manpower fluctuate


Level
constant workforce/production level with fluctuating inventory levels


Stable Workforce
Size of workforce is constant, but number of hours worked fluctuate


Level Plan Without Backorders
1. Level plan with minimum inventory and no backorders
2. Key point: in one of six months ending inventory will be zero. (If it never falls to zero, we are
keeping more inventory than needed)
3. Solution: solve 6 level plans (for each month?) - each plan has zero ending inventory in one of the
six months. Highest production level is solution.


Determinants of Time Horizon and Buckets
Development and Variability. An industry with rapid new product development and high variability
will typically have a shorter horizon with short time buckets. But industries with long lead times and
stable products will often have longer planning horizons and/or longer time buckets.


Rolling Horizon
we do not wait for entire plan to have been executed to develop a new one. For example if a 1 year
plan is divided into 1-month time buckets at the end of 1st time bucket the remaining 11 are
evaluated and a new one bucket is added.


Inventory Section

Written for

Course

Document information

Uploaded on
April 11, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.89
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LectAziim Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
21
Member since
2 year
Number of followers
13
Documents
4683
Last sold
5 months ago
Dont stress yourself on study materials .LectAziim got it all

"Unlock your potential with our online writing store! Discover expert guidance, personalized feedback, and tools for every writer's journey. From crafting compelling essays to mastering creative storytelling, our platform offers interactive courses, one-on-one coaching, and resources tailored to your goals. Start writing your success story today with us!"

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions