LEED AP BD+C Study Exam 1 Questions with 100% Correct Answers
Which of the following factors influence the recycling efforts within buildings? A) Lack of education B) Non-availability of recycling programs in town C) ignorance about recycling D) lack of convenient, physical spaces for recycling Correct Answer D) lack of convenient, physical spaces for recycling A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will this have a positive affect? (choose 2) A) MR Credit Building Life-Cycle impact reduction B) MR Credit Furniture and Medical Furnishings C) MR Prerequisite Storage and Collection of Recyclables D) MR Credit Construction and Demolition Waste Management Correct Answer A) MR Credit Building Life Cycle Impact Reduction D) MR Credit Construction and Demolition Waste Management A project has limited storage area for waste containers. What would you recommend for this project to earn MR credit construction waste management? Correct Answer commingle collection recycling a facility is considering mercury-free alternatives to low wattage fluorescent lamps such as LEDs in order to meet Prerequisite PBT source reduction - Mercury. What is true for the project to use this strategy? Correct Answer mercury free alternatives should be at least as energy efficient as comparable mercury containing lamps a project is pursuing MR credit building life-cycle impact reduction using Option 3: Building and Material Resue. What will determine the number of points the projects can earn using this option? Correct Answer percentage of completed project surface area reused A project is pursuing MR Credit Building Product Disclosure and Optimization - Environmental Product Declarations using Option 2. What should the project team do in order to qualify for exemplary performance? Correct Answer Purchase 75% (by cost) of permanently installed building products that meet the required attributes what must be true for the scope of EPDs to adhere with MR credit Building Product Disclosure and Optimization - EPD requirements? Correct Answer the scope of any EPD must be at least cradle-to-gate Which of the following is true for a healthcare project, pursuing MR Credit Medical Furniture and Furnishings and MR Credit Building Product Disclosure and Optimization? Correct Answer freestanding furniture items included in MR Credit
Geschreven voor
- Instelling
- LEED AP BD+C
- Vak
- LEED AP BD+C
Documentinformatie
- Geüpload op
- 4 april 2024
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
which of the following factors influence the recyc
Ook beschikbaar in voordeelbundel