Wastewater Collections III Exam Questions with 100% Correct Answers
WASTEWATER FORCE MAIN PRESSURE RATING IS. A. 75 B. 100 C. 125 D. 150 E. 200 Correct Answer D. 150 THE MOST CRITICAL FACTORS OF THE FINAL GRADE OF A GRAVITY WASTEWATER PIPE SHOULD BE? A. ALIGNMENT B. CHOICE OF PIPE MATERIALS C. CHOICE OF LEVELING EQUIPMENT D. CHOICE OF EXCAVATING EQUIPMENT E. CHOICE OF PIPE BEDDING Correct Answer E. CHOICE OF PIPE BEDDING SETTING GOALS WORKS BEST WHEN? A. ACCOMPANIED BY AN ACTION PLAN B. DEVELOPED BY MANAGER C. DEVELOPED BY EMPLOYEE Correct Answer C. DEVELOPED BY EMPLOYEE PARTICIPATORY MANAGEMENT MEANS? A. LISTEN TO IDEAS AND THEN TAKE OVER B. BE A MEMBER INSTEAD OF A BOSS Correct Answer B. BE A MEMBER INSTEAD OF A BOSS CLASS III COLLECTION SYSTEM LICENSE OR CLASS B WASTEWATER TREATMENT PLANT OPERATOR LICENSE IS REQUIRED FOR AT LEAST SUPERVISOR OF CONSTRUCTION AND MAINTENANCE CREWS IN WASTEWATER SYSTEMS WITH AVERAGE FLOW GREATER THAN? A. 100,000 B. 500,000 C. 1,000,000 Correct Answer C. 1,000,000. Category III COLLECTION SYSTEM OVER 1 MGD REQUIRES CLASS III OR B LICENSE. IF WASTEWATER TREATMENT OPERATING COMPANY CEASES OPERATION AND ANOTHER ONE TAKES OVER FROM THEM WHICH IS TRUE? A. NEW COMPANY MUST IMMEDIATELY APPLY FOR A NEW CERTIFICATION. B. NEW COMPANY MUST NOTIFY TNRCC WITHIN 30 DAYS
Geschreven voor
- Instelling
- Wastewater Collections III
- Vak
- Wastewater Collections III
Documentinformatie
- Geüpload op
- 4 april 2024
- Aantal pagina's
- 7
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
wastewater force main pressure rating is
Ook beschikbaar in voordeelbundel