881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items. " In the document, how many types of systems are covered? ✔✔11 eleven What are the common elements of WBSs? ✔✔integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? ✔✔system elements The common elements of a WBS are elements c ommon to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. ✔✔false; common elements can be found at all level s of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? ✔✔program management office PMO Contract WBS is controlled and maintained by? ✔✔the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? ✔✔fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? ✔✔Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware a nd software and includes the aggregations of system -level services such as program
ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+
The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? MIL-STD881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items." In the document, how many types of systems are covered? 11 eleven What are the common elements of WBSs? integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? system elements The common elements of a WBS are elements common to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of
Written for
- Institution
- ACQ 101 module 6
- Course
- ACQ 101 module 6
Document information
- Uploaded on
- April 4, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- acq 101 module 6 test
- acq 101 module 6 shotgun
-
acq 101 module 6 assessment
-
acq 101 module 6 evaluation
Content preview
881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items. " In the document, how many types of systems are covered? ✔✔11 eleven What are the common elements of WBSs? ✔✔integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? ✔✔system elements The common elements of a WBS are elements c ommon to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. ✔✔false; common elements can be found at all level s of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? ✔✔program management office PMO Contract WBS is controlled and maintained by? ✔✔the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? ✔✔fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? ✔✔Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware a nd software and includes the aggregations of system -level services such as program
Also available in package deal