OSSF Module 1 Questions And Answers Rated 100% Correct!!
First statewide regulation of OSSF year - Answer-1989 TNRCC - Answer-Texas natural resource of conservation commision OSSF cant produce more than - Answer-5000 gallons per day Local government entity authorized by the TCEQ to implement and enforce OSSF - AnswerAuthorized agent Authorized agent includes - Answer-Cities, counties, river authorities, and special districts such as water district and municipal utility districts Ten acre rule - Answer-Maybe exempt from permits if you own 10 acres or more (Authorized agents local ordinances) Who can build their own system - Answer-Owners of single family homes Installer 1 qualifications - Answer-No experience Installer 11 qualifications - Answer-Documented experience 1 year as an installer 1 and 3 installations Two years as an apprentice and 6 installs How to document experience for installer II - Answer--statements from non related clients or statement from DR -statement from supervising installer or statement from DR Designated Representative qualifications - Answer-No experience Designated by an authorized agentSite evaluator qualifications - Answer-Possess any of the following -installer II -DR -PE -RS -professional geoscientist license in soil science Maintenance provider - Answer-Hold a current installer 2 license, Class C wastewater license or submit acceptable documentation of three years experience as a mai ten ever technician Most important part of DRs job - Answer-Issue authorization to construct What must be planned by a PE or RS - Answer-Subdivisions, multiple systems on the same tract of land, small lots, variance requested, Edwards aquifer, RV parks all proprietary that are also aerobic and any surface application Authorization to construct is valid for - Answer-1 year Application time frame - Answer-Must be approved or denied within 30 days Primary purpose of the OSSF program - Answer-Protection of the public health and the environment against potential waterborne diseases Acceptable protective measures for prevention of unauthorized entry - Answer--padlock -cover that requires tools -cover with a min net weight of 65 pounds The _________ adopted the current OSSF rules in ______ and revised them several times - AnswerTCEQ and 1997 The _________ is responsible for reviewing permit applications, site evaluations, planning materials and conducting inspections of OSSFs - Answer-Designated represenativeAn individual who holds a valid license form the TCEQ and who is compensated by another individual to construct, install, alter or repair an OSSF is an - Answer-Installer An individual who visits a site and conducts soil evaluations and a site survey is an - Answer-Site evaluator List the OSSF licenses that require previous experience - Answer-Installer II Maintenance Provider Site evaluator Individuals working as an ________ or any capacity for an OSSF __________ cannot work as an installer, designer for a fee, or private site evaluator within the jurisdication of the permitting authority - Answer-DR and authorized agent What is needed to pre-quality for an wexam - Answer-Application Pay for class and license fee Complete course exam New OSSF licenses are issued for terms of ____ . An individual must complete ____ hours of the TCEQ approved continuing education courses in order to renew license - Answer-3 years and 24 hours List the nine steps of the permitting process - Answer-Site evaluation Selection of an OSSF System must be planned Permit application and planning material submitted Application and planning material reviewed An authorization or permit to construct Construction Inspection Notice of approval or license to operate
Geschreven voor
- Instelling
- OSSF Module 1
- Vak
- OSSF Module 1
Documentinformatie
- Geüpload op
- 1 april 2024
- Aantal pagina's
- 4
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
Ook beschikbaar in voordeelbundel