API 570 Exam Questions and Answers 100% Pass
API 570 Exam Questions and Answers 100% Pass Section 1 - Scope 1-Which of the following activities is NOT included in the scope of API 570? - Answer- Operating a pipe system 2-Which of the following activities is NOT included in the scope of API 570? - Answer- Performing pipe fabrication 3-API 570 pertains to: - Answer- Only to metallic and FRP pipe 4-API 570 pertains only to: - Answer- Pipe and their associated relief devices 5-The inspector discovers a problem on a pipe that requires corrective action. Who is responsible to respond to this issue? - Answer- Owner/User 6-API 570 is used: - Answer- By petro-chemical facilities 7-API 570 takes effect: - Answer- Once the pipe is places in service 8-Companies that use API 570 must: - Answer- Either employ or have access to an authorized inspection agency 9-During a piping repair, if there is a conflict between the requirements of API 570 and the construction code, which should be followed? - Answer- API 570 10-Duringa piping alteration, if there is a conflict between the requirements of API 570 and the construction code, which should be followed? - Answer- API 570 11-An in-service pipe in being repaired or altered. If there is a conflict between the requirements of API 570 and the legal jurisdiction, which should be followed? - Answer- The most stringent requirements 12-An in-service piping system is inspected. If there is a conflict between the requirements of API 570 and the legal jurisdiction, which should be followed? - Answer- The most stringent requirements 13-The requirements of API 570 are considered optional for which of the following piping systems? - Answer- 300 psig steam system 14-The requirements of API 570 are considered optional for which of the following piping systems? - Answer- Category D piping 15-Which of the following chemical plant piping is NOT included in the scope of API 570? - Answer- 4 NPS low-density polyethylene pipe 16-Which code is used for Fitness for Service evaluations? - Answer- API 579 17-Which code is used for RBI evaluations? - Answer- API 580 Section 2 1-During an in-service internal inspection, a crack is discovered on a longitudinal weld. This crack can be evaluated to which code? - Answer- API 579 2-Which code provides requirements for hot tapping? - Answer- API 2201 3-Which publication provides information on corrosion mechanisms? - Answer- API 571 4-Which publication is used for RBI assessments? - Answer- API 580 5-Which recommended practice is used for guidance in inspecting and testing valves? - Answer- API 578 **6-Which document can be used when determining soil resistivity? - Answer- ASTM G57 **7-Which document can provide more information on Injectionmand Mixing points? - Answer- NACE RP 34101 Section 3 1-Which of the following is considered a piping alteration? - Answer- Replacement 4 NPS portion of a line with a 6 NPS section 2-An alteration on a piping system is defined as: - Answer- Any physical change with design implications 3-Which of the following inspection organizations is NOT considered an acceptable API 570 Authorized Inspection Agency? - Answer- Piping fabricator 4-Which of the following is considered an API 570 Authorized Inspection Agency? - Answer- The inspection organization of the jurisdiction 5-A CML is: - Answer- A point or plane through the pipe 6-A critical check valve is one that: - Answer- Could cause a hazardous event (like Boom!) if it fails 7-A defect is defined as: - Answer- A discontinuity that exceeds the applicable code's criteria 8-What is maximum diameter of an examination point on an 8 NPS line? - Answer- 2" 9-What is maximum diameter of an exa
Written for
- Institution
- API 570
- Course
- API 570
Document information
- Uploaded on
- March 31, 2024
- Number of pages
- 35
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
api 570 exam questions and answers 100 pass
Also available in package deal