FDNY G60 PRACTICE TEST WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025
FDNY G60 PRACTICE TEST WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025 Sprinkler system must NOT be shut off or impaired while hot work is performed - Correct Answer Place damp cloth guards on individual sprinkler heads The person conducting the fire watch ______ have other duties - Correct Answer CANNOT A portable fire extinguisher with a rating of _________ is required and should be within ____ feet travel distance hot work area - Correct Answer 2-A:20-B:C///30 For ROOFING OPERATIONS, a portable fire extinguisher with a minimum rating of ______ is required - Correct Answer 3-A:40-B:C Fire watch on floors below is ______ - Correct Answer required The fire watch must continue for a minimum of ____ minutes after the hot work is done - Correct Answer 30 For any CNG or LPG torch operations, the first inspection shall be conducted ___ minutes after completion. The second inspection shall be conducted _______ after completion of torch operations. - Correct Answer 30 min///1 hour The fire guard or fire watch personnel must complete a signed inspection report and it must be submitted to and retained by the person in charge of the torch operations. - Correct Answer The report must be made available and maintained on the premises for a minimum of 48 hours after the work is complete. Most common fuel gasses used in blowtorches are ______ - Correct Answer LPG (butane, propane) natural gas (methane) (either CNG or piped natural gasses)
École, étude et sujet
- Établissement
- FDNYC G60
- Cours
- FDNYC G60
Infos sur le Document
- Publié le
- 31 mars 2024
- Nombre de pages
- 6
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
sprinkler system must not be shut off or
-
the person conducting the fire watch have
-
a portable fire extinguisher with a rating of
-
for roofing operations a portable fire