LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct answer EPDs must be at least cradle-to-gate What must be true for a healthcare project pursuing MR Credit Medical Furniture and Furnishings and MR Credit Building Product Disclosure and Optimization? - correct answer For Healthcare projects, the scope of MR Credit Medical Furniture and Furnishings includes all freestanding furniture and medical furnishings. Freestanding furniture items included in this credit cannot be counted in any Building Product Disclosure and Optimization credits, to avoid double-counting What must be true of products reused and including recycled content contributing towards MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials using option 1. Raw Material Sourcing and Extraction Reporting? - correct answer For credit achievement calculation, the base contributing cost of individual products compliant with multiple responsible extraction criteria is not permitted to exceed 100% its total actual cost (before regional multipliers) and double counting of single product components compliant with multiple responsible extraction criteria is not permitted and in no case is a product permitted to contribute more than 200% of its total actual cost. A project pursuing MR Credit Building Product Disclosure and Optimization— Sourcing of Raw Materials is using Option 2. Leadership Extraction Practices to comply with credit requirements. Which of the following products have the greatest impact towards credit achievement? - correct answer Under Option 2. Leadership Extraction Practices (1 point) - projects should use products that meet at least one of the responsible extraction criteria below for at least 25%, by cost, of the total value of permanently installed building products in the project Extended producer responsibility: valued at 50% of their cost All others are valued at 100% Bio-based materials. Bio-based products must meet the Sustainable Agriculture Network's Sustainable Agriculture Standard. (ASTM Test Method D6866 and be legally harvested, as defined by the exporting and receiving country) Wood products (FSC or approved equivalent) Materials reuse Recycled content. Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on cost. USGBC approved program. Other USGBC approved programs meeting leadership extraction criteria. + products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base contributing cost. Also note that for credit achievement calculation, the base contributing cost of individual products compliant with multiple responsible extraction criteria is not permitted to exceed 100% its total actual cost (before regional multipliers) and double counting of single product components compliant with multiple responsible extraction criteria is not permitted and in no case is a product permitted to contribute more than 200% of its total actual cost. MR Credit Building Product Disclosure and Optimization— Material Ingredients using Option 1. Material Ingredient Reporting to comply with credit requirements. Which of the following materials would comply? - The end use product has been certified at the Cradle to Cradle v2 Basic level - A product with recycled content - The end use product has been certified at the Cradle to Cradle v3 Bronze level. - The end use product has been certified at the Cradle to Grave v3 Bronze level. - The end use product has a published, complete Health Product Declaration - A product with EPD - correct answer Manufacturer Inventory - The manufacturer has published complete content inventory for the product following these guidelines: °° A publicly available inventory of all ingredients identified by name and Chemical Abstract Service Registration Number (CASRN) °° Materials defined as trade secret or intellectual property may withhold the name and/or CASRN but must disclose role, amount and GreenScreen benchmark, as defined in GreenScreen v1.2 (another possible question). ·· Health Product Declaration. The end use product has a published, complete Health Product Declaration with full disclosure of known hazards in compliance with the Health Product Declaration open Standard. ·· Cradle to Cradle. The end use product has been certified at the Cradle to Cradle v2 Basic level or Cradle to Cradle v3 Bronze level. ·· USGBC approved program. Other USGBC approved programs meeting the material ingredient reporting A healthcare project is pursuing PBT Source Reduction— Lead, Cadmium, and Copper. Which of the following should the project teams do specify Lead? - None - Specify and use electrical wire and cable with lead content less than 500 parts per million - Specify and use lead-free roofing and flashing - Specify Lead used for radiation shielding and copper used for MRI shielding - Specify products with the "lead free" label as defined by the Safe Drinking Water Act (SDWA) - correct answer - Specify and use lead-free roofing and flashing - Specify and use electrical wire and cable with lead content less than 300 parts per million - Lead used for radiation shielding and copper used for MRI shielding is exempt products with the "lead free" label as defined by the Safe Drinking Water Act (SDWA) don't quality Which of the following are requirements for EQ credit interior lighting - option 1 - lighting controls? (Choose 2) - Projects should provide individual lighting controls that enable occupants to adjust the lighting to suit their individual tasks and performance for at least 75% of individual occupant spaces - Projects should provide individual lighting controls that enable occupants to adjust the lighting to suit their individual tasks and performance for at least 90% of individual occupant spaces - For at least 90% of individual occupant spaces,provide individual lighting controls with at least three lighting levels or scenes(on,off,mid level) - For at least 90% of individual occupant spaces,provide individual lighting controls with at least two lighting levels or scenes(on,off) - correct answer Option 1. Lighting Control (1 point) For at least 90% of individual occupant spaces, provide individual lighting controls that enable occupants to adjust the lighting to suit their individual tasks and preferences, with at least three lighting levels or scenes (on, off, midlevel). Midlevel is 30% to 70% of the maximum illumination level (not including daylight contributions). For all shared multioccupant spaces, meet all of the following requirements. ·· Have in place multizone control systems that enable occupants to adjust the lighting to meet group needs and preferences, with at least three lighting levels or scenes (on, off, midlevel). ·· Lighting for any presentation or projection wall must be separately controlled. ·· Switches or manual controls must be located in the same space as the controlled luminaires. A person operating the controls must have a direct line of sight to the controlled luminaires. EQ credit interior lighting - option 2 - Lighting Quality - correct answer Option 2. Lighting Quality (1 point) Choose four of the following strategies. A. For all regularly occupied spaces, use light fixtures with a luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir. Exceptions include wallwash fixtures properly aimed at walls, as specified by manufacturer's data, indirect uplighting fixtures, provided there is no view down into these uplights from a regularly occupied space above, and any other specific applications (i.e. adjustable fixtures). B. For the entire project, use light sources with a CRI of 80 or higher. Exceptions include lamps or fixtures specifically designed to provide colored lighting for effect, site lighting, or other special use. C. For at least 75% of the total connected lighting load, use light sources that have a rated life (or L70 for LED sources) of at least 24,000 hours (at 3-hour per start, if applicable). D. Use direct-only overhead lighting for 25% or less of the total connected lighting load for all regularly occupied spaces. E. For at least 90% of the regularly occupied floor area, meet or exceed the following thresholds for areaweighted average surface reflectance: 85% for ceilings, 60% for walls, and 25% for floors. F. If furniture is included in the scope of work, select furniture finishes to meet or exceed the following thresholds for area-weighted average surface reflectance: 45% for work surfaces, and 50% for movable partitions. G. For at least 75% of the regularly occupied floor area, meet a ratio of average wall surface illuminance (excluding fenestration) to average work plane (or surface, if defined) illuminance that does not exceed 1:10. Must also meet strategy E, strategy F, or demonstrate area-weighted surface reflectance of at least 60% for walls. H. For at least 75% of the regularly occupied floor area, meet a ratio of averag - correct answer Specifying low-emitting products and materials will improve indoor air quality, increase the effectiveness of a flush-out, and increase the likelihood of passing the air quality tests. For projects that pursue Option 1 under Construction IAQ management credit - Proper attention to contaminants during construction will improve overall indoor air quality, increase the effectiveness of a flush-out, and increase the likelihood of passing the air quality tests. Recommended strategies for a hotel project with an atrium pursuing EQ credit Quality Views? - correct answer Conference rooms, Gymnasiums and Conference rooms that are dedicated to video conferencing may be excluded The reference standard for this credit is Windows and Offices: A Study of Office Worker Performance and the Indoor Environment Atriums qualify for up to 30% of the total area. View factors should be more than 3 Multiple lines of sight to vision glazing must be 90 degrees apart A hotel project decides to do air-testing to achieve EQ Credit IAQ Assessment. Which of the following must be true in order for the project to earn the credit? - correct answer For offices, retail, schools, hospitality, and multifamily residential projects, test areas no larger than 5,000 square feet (465 square meters). The test should be done in breathign zone - 3 and 6 feet . The test should be done during normal occupied hours Other scenarios For warehouses or large open spaces in other building types (e.g., ballrooms in hospitality, gymnasiums in schools), a limit of 50,000 square feet (4 654 square meters) may be used. If there is evidence that the air in the space is well mixed and sources of contaminants of concern are uniform, project teams may test a single location in that space. A healthcare project with mechanical ventilation is implementing interior cross-contamination prevention, filtration and adding an entry way system. Which of the following must a healthcare project do in addition to the entryway systems to earn EA Credit Enhanced Indoor Air Quality Strategies using Option 1. Enhanced IAQ Strategies? - correct answer For healthcare projects - In addition to the entryway system, provide pressurized entryway vestibules at high-volume building entrances. Option c - only applies to projects with natural ventilation or mixed mode. In our question it says the project is mechanically ventilated. A school project is located within one-half mile (800 meters) from a busy highway. Which of the following must be true for the project t earn LEED certification? - correct answer School project at least one-half mile (800 meters) from any significant noise source (e.g., aircraft overflights, highways, trains, industry) are exempt. During construction, a project team prepares a plan to perform building flush-out to achieve EQ Credit IAQ Assessment. Due to some delays, the construction schedule gets extended. Which of the following could the project do if they run out of time to complete a flush-out? - correct answer Since in this case, they run out of time to complete a flush-out - project could pursue Option 2 which can typically be completed in less time than a flush-out, but the cost of air quality testing must be factored into the project budget (another possible question) What is true of projects located in EPA Radon Zone 1? - correct answer If the project building contains residential units, each dwelling unit must meet all of the following requirements. ·· Unvented combustion appliances (e.g., decorative logs) are not allowed. ·· Carbon monoxide monitors must be installed on each floor of each unit. ·· All indoor fireplaces and woodstoves must have solid glass enclosures or doors that seal when closed. ·· Any indoor fireplaces and woodstoves that are not closed combustion or power-vented must pass a backdraft potential test to ensure that depressurization of the combustion appliance zone is less than 5 Pa. ·· Space- and water-heating equipment that involves combustion must be designed and installed with closed combustion (i.e., sealed supply air and exhaust ducting) or with power-vented exhaust, or located in a detached utility building or open-air facility. ·· For projects in high-risk areas for radon, EPA Radon Zone 1 (or local equivalent for projects outside the U.S.), design and construct any dwelling unit on levels one through four above grade with radon-resistant construction techniques. Follow the techniques prescribed in EPA Building Radon Out; NFPA 5000, Chapter 49; International Residential Code, Appendix F; CABO, Appendix F; ASTM E1465; or a local equivalent, whichever is most stringent (possible quesiton). A project design with mechanical ventilation should use which of the following filtration to earn EQ Credit Enhanced IAQ Strategies? - correct answer For EQ Credit Enhanced IAQ Strategies, Each ventilation system that supplies outdoor air to occupied spaces must have particle filters or air-cleaning devices that meet one of the following filtration media requirements: ·· minimum efficiency reporting value (MERV) of 13 or higher, in accordance with ASHRAE Standard 52.2-2007; or ·· Class F7 or higher as defined by CEN Standard EN 779-2002, Particulate Air Filters for General Ventilation, Determination of the Filtration Performance. Projects should also replace all air filtration media after completion of construction and before occupancy. Which of the following are acceptable glare control devises for EQ Credit Daylight?(Choose 3) - correct answer Acceptable glare-control devices include interior window blinds, shades, curtains, movable exterior louvers, movable screens, and movable awnings. All glare-control devices must be operable by the building's occupants to address unpredicted glare. Automatic devices with user override are acceptable. Diffused and translucent glazing systems do not require glare-control devices. The HVAC contractor for a small office project is planning to perform flush-out construction ends and the building has been completely cleaned in order for the project to earn EQ Credit Indoor Air Quality Assessment. Which of the following actions he must take If occupancy is desired before the flush-out is completed? - correct answer For option 1 flush-out - if occupancy is desired before the flush-out is completed, the space may be occupied only after delivery of a minimum of 3,500 cubic feet of outdoor air per square foot (1 066 260 liters per second of outdoor air per square meter) of gross floor area while maintaining an internal temperature of at least 60°F (15°C) and no higher than 80°F (27°C) and relative humidity no higher than 60% (another possible question). Air testing is option 2 which cannot be combined with option 1 for credit achievement. Earning which of th
Geschreven voor
- Instelling
- LEED.
- Vak
- LEED.
Documentinformatie
- Geüpload op
- 30 maart 2024
- Aantal pagina's
- 36
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden