100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

General crane safety Exam Questions And Answers Solved 100 Correct

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
25-03-2024
Written in
2023/2024

General crane safety Exam Questions And Answers Solved 100% Correct. The minimum crane team for a mobile crane on outriggers would consist of- A) The Crane Operator, Rigger Supervisor, and Crane Rigger B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and Crane Rigger C) The Crane Operator, Crane Supervisor, and Crane Rigger D) The Crane Operator and Rigger-in-Charge E) The Crane Operator, Crane Walker, and Crane Rigger When operating floating cranes, you must start swinging or rotating quickly and stop smoothly to prevent excessive barge list. A) True B) False Extending a telescoping boom without lowering the hoist may result in "two-blocking" the crane. A) True B) False All of the following require a license to operate EXCEPT a(n)- A) Cab-operated category 3 bridge crane B) Mobile hydraulic truck crane C) Non-cab operated category 3 bridge crane D) Articulating boom category 4 crane E) Floor-operated category 2 bridge crane Which of the following lift types would NOT be considered a complex lift? A) Multiple-crane lifts B) Oxygen/Acetylene bottles in racks designed for lifting O C) Large geometric shapes D) Loads with multi-level attachment points E) Hazardous or explosive materials What is the minimum amount of rope that shall be on a grooved drum and a smooth drum? A) There is no minimum B) 4 full wraps, 2 full wraps C) 2 full wraps, 3 full wraps D) 6 full wraps, 4 full wraps E) 1 full wrap, 2 full wraps The horizontal distance from the center of rotation of the crane to the center of the hoist line(s) with load applied is called A) Boom Length B) Radius C) Lift Zone D) Quadrant E) Circumference What is two-blocking, and why is two-blocking dangerous? A) Two-blocking occurs when the hook contacts another block or hook on the crane. It is dangerous because the hook could damage the crane, causing loss of load control. B) Two-blocking occurs when the block or hook contacts the ground. It is dangerous because the wire rope may come off of the drum and drop the block. C) Two-blocking occurs when the hook block comes in contact with the upper sheave block during hoisting of the hook. It is dangerous because it could result in damage to the crane, parting of the hoist lines, and dropping the load. When should a tagline be used during lifting operations? A) when lifting a load over or near electrical transmission lines B) to prevent the load from swinging or rotating C) when the supervisor approves their use D) only when lifting the load to extreme heights What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit weight of 15 lbs. per square foot of material per inch of thickness? A) 348 pounds B) 720 pounds C) 6,720 pounds D) 60 pounds E) 120 pounds The two expiration dates that are of particular importance to crane operators are- A) Vehicle registration expiration date B) Hydraulic oil expiration date C) CAC card expiration date D) The certification expiration date of the crane E) The crane operator's license expiration date Which of the following is NOT an acceptable method of communication between the signal person and the crane operator? A) Signal Flags B) Direct Voice C) Hand Signals D) Sound-powered Phones E) Approved Radios What is a jib boom? A) A boom that is attached to the main boom to allow rotation of the load B) An extension attached to the main boom used when lifting light loads to a higher elevation than that permitted by the main boom C) A boom that is used to lift extremely heavy loads If you find cracking or flaking paint on a welded joint of a structural component on the boom, you should A) Look closer to see if it is a crack. B) Report it immediately to your supervisor. C) Do nothing as it is not significant. D) Make a mental note to investigate it later. E) Note it on the ODCL, but do not report it. While performing a pre-use check, the operator must check the wire rope system for all of the following EXCEPT- A) Excessive corrosion B) Damage of any kind C) Size and grade of wire rope D) Proper sheave movement E) Proper spooling on the drum All of the following are principle parts of an overhead traveling crane EXCEPT- A) Operator's cab or pendant control B) End trucks C) Shackles and eyebolts D) Bridge girders E) Trolley with hoisting mechanism If you find a deficiency that will affect the safe operation of the crane during the pre-operational check, all of the following actions must be taken EXCEPT- A) Operate that specific function again to ensure there is a problem B) Notify your supervisor C) Note the finding on the ODCL D) Secure the crane E) Follow supervisor's instructions Components that provide protection for operation and maintenance personnel working on or in the path of cranes are? A) Operational Safety Devices B) Alterations/Modifications C) Load Controlling Parts D) Load Bearing Parts E) General Safety Devices When setting up mobile cranes, the minimum clearance between the rotating upper works and fixed objects should be? A) 1 foot B) 2 feet C) 3 feet D) 4 feet E) 5 feet The rated load of the hook block installed on a crane may limit the crane's lifting capacity. A) True B) False When crane accidents happen or damage is found, you must do all of the following EXCEPT A) Continue operating until the supervisor performs an evaluation B) Put the load in a safe condition C) Standby for instructions D) Stop operations E) Contact your supervisor When should the rotate locking device be engaged on a mobile crane? A) when hoisting a load B) while the crane is traveling with a load in "pick and carry" mode C) any other time required by the crane OEM D) when landing a load E) whenever using the LMI system F) whenever the operator leaves the cab In cold weather operation, what precautions should be taken during the pre-operational check or ODCL to avoid damage when sheaves may be frozen? A) Check the hoist and boom lower limit switches first B) Hoist down first and check the lower limit switch C) Raise the blocks and boom before lowering them D) Lower the boom prior to raising it E) Lower the blocks prior to raising them If the crane operator and the Rigger-in-Charge disagree on whether or not a load is safe to lift, the operator should- A) Follow the instructions of the Rigger-in-Charge B) Note the incident on the back of the ODCL card C) Not operate the crane until contacting the supervisor to resolve the issue D) Proceed slowly with extreme caution E) Tell his or her supervisor at the end of the shift Components that control, restrain, or position the load and upon failure W would cause dropping, shifting, or uncontrolled movement of the load are A) Alterations and/or modifications B) Operational safety devices C) Load bearing parts D) Load controlling parts E) General safety devices The Rigger-in-Charge has primary responsibility for determining the weight of an object to be hoisted; however, the operator must be satisfied that the estimated weight to be lifted will not exceed the safe load carrying capacity of the crane. A) True B) False The crane operator must check the certification information on the crane for before operating the crane. A) Operator's name, license number, and expiration date B) Certified capacity, gross vehicle weight, and expiration date C) Crane ID number, OEM capacity, and test date D) Certification expiration date, crane ID, and certified capacity E) Crane manufacturer, crane ID, and certified capacity During performance of your pre-operational check of the crane, you find minor deficiencies. What do you do? A) Stop, secure the crane, and notify your supervisor. Do not operate the crane until the deficiencies are corrected B) Shut the crane down and return to your supervisor for additional work C) Call your supervisor and let him or her know what the deficiencies are D) Note the deficiencies on the ODCL Why is it important to have bent or dented crane boom members inspected and evaluated? up A) Because bends and dents may cause the wire rope to get hung B) Because bends and dents can reduce the strength of a boom resulting in sudden collapse C) Because bends and dents may cause the crane to lose stability and tip over D) Because bends and dents can cause the capacity of the crane to be reduced during the next load test What are the actions required if an asterisked item on the ODCL is found unsatisfactory during the pre-use check of the crane? A) Stop operations and notify your supervisor. Keep operating the crane until engineering or maintenance arrives. B) Stop operations, notify your supervisor of the condition, and annotate the deficiency on the ODCL. C) Stop operation and notify engineering of the deficiency. D) Note the deficiency on the ODCL and keep operating the crane until engineering arrives to perform an evaluation.

Show more Read less
Institution
Module










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Module

Document information

Uploaded on
March 25, 2024
Number of pages
29
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

General crane safety Exam Questions And
Answers Solved 100% Correct.

1). The minimum crane team for a mobile crane on outriggers would consist of-
a) the crane operator, rigger supervisor, and crane rigger
b) the crane operator, crane supervisor, rigger supervisor, and
crane rigger
c) the crane operator, crane supervisor, and crane rigger
d) the crane operator and rigger-in-charge
e) the crane operator, crane walker, and crane rigger

 Ans: C) The Crane Operator, Crane Supervisor, and Crane Rigger


2). When operating floating cranes, you must start swinging or rotating quickly and stop
smoothly to prevent excessive barge list.
a) true
b) false

 Ans: B) False


3). Extending a telescoping boom without lowering the hoist may result in "two-blocking" the
crane.
a) true
b) false

 Ans: A) True


4). All of the following require a license to operate except a(n)-
a) cab-operated category 3 bridge crane
b) mobile hydraulic truck crane
c) non-cab operated category 3 bridge crane
d) articulating boom category 4 crane
e) floor-operated category 2 bridge crane

 Ans: C) Non-cab operated category 3 bridge crane


5). Which of the following lift types would not be considered a complex lift?
a) multiple-crane lifts
b) oxygen/acetylene bottles in racks designed for lifting


PaperStoc.com Page 1 of 29

, o c) large geometric shapes
d) loads with multi-level attachment points
e) hazardous or explosive materials

 Ans: B) Oxygen/Acetylene bottles in racks designed for lifting


6). What is the minimum amount of rope that shall be on a grooved drum and a smooth
drum?
a) there is no minimum
b) 4 full wraps, 2 full wraps
c) 2 full wraps, 3 full wraps
d) 6 full wraps, 4 full wraps
e) 1 full wrap, 2 full wraps

 Ans: B) 4 full wraps, 2 full wraps


7). The horizontal distance from the center of rotation of the crane to the center of the hoist
line(s) with load applied is called
a) boom length
b) radius
c) lift zone
d) quadrant
e) circumference

 Ans: B) Radius


8). What is two-blocking, and why is two-blocking dangerous?
a) two-blocking occurs when the hook contacts another block or hook on the crane. it is
dangerous because the hook could damage the crane, causing loss of load control.
b) two-blocking occurs when the block or hook contacts the ground.
it is dangerous because the wire rope may come off of the drum and drop the block.
c) two-blocking occurs when the hook block comes in contact with the upper sheave block
during hoisting of the hook. it is dangerous because it could result in damage to the crane,
parting of the hoist lines, and dropping the load.

 Ans: C) Two-blocking occurs when the hook block comes in contact with the upper
sheave block during hoisting of the hook. It is dangerous because it could result in
damage to the crane, parting of the hoist lines, and dropping the load.


9). When should a tagline be used during lifting operations?
a) when lifting a load over or near electrical transmission lines
b) to prevent the load from swinging or rotating




PaperStoc.com Page 2 of 29

, c) when the supervisor approves their use
d) only when lifting the load to extreme heights

 Ans: B) to prevent the load from swinging or rotating


10). What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit weight of 15
lbs. per square foot of material per inch of thickness?
a) 348 pounds
b) 720 pounds
c) 6,720 pounds
d) 60 pounds
e) 120 pounds

 Ans: B) 720 pounds


11). The two expiration dates that are of particular importance to crane operators are-
a) vehicle registration expiration date
b) hydraulic oil expiration date
c) cac card expiration date
d) the certification expiration date of the crane
e) the crane operator's license expiration date

 Ans: D) The certification expiration date of the crane
E) The crane operator's license expiration date


12). Which of the following is not an acceptable method of communication between the signal
person and the crane operator?
a) signal flags
b) direct voice
c) hand signals
d) sound-powered phones
e) approved radios

 Ans: A) Signal Flags




PaperStoc.com Page 3 of 29

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Academik001 Exam Questions
Follow You need to be logged in order to follow users or courses
Sold
16
Member since
3 year
Number of followers
10
Documents
2263
Last sold
9 months ago

Buy Best Exam Answers

4.0

2 reviews

5
1
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions