CDT Exam Prep 1-4 Questions With 100% Correct Answers 2024
CDT Exam Prep 1-4 Questions With 100% Correct Answers 2024 Bidding documents are considered legal documents? ▪ True. ▪ False. - answerFalse Codes governing commercial construction and residential construction are different? ▪ True. ▪ False. - answerTrue The A/E usually hires a construction manager? - answerFalse The Owner, Contractor and A/E are parties to the construction agreement? ▪ True. ▪False. - answerFalse There are no differences between the AIA and EJCDC general conditions? ▪ True. ▪False. - answerFalse The drawings take precedence over the specifications? ▪ True. ▪False. - answerFalse The role of a subcontractor is the same as a material supplier? ▪ True. ▪ False. - answerFalse The supplementary conditions should be coordinated with the Owner/A/E agreement? ▪ True. ▪Fals - answerTrue nProject descriptions and outline specifications are legal and binding documents? ▪ True. ▪False - answerFalse nThe contractor and the A/E review submittals for the same reasons and from the same point of view? ▪ True. ▪False - answerF In 1964, the term "Project Manual" was introduced by the: A. American Bar Association. B. American Institute of Architects. C. Construction Specifications Institute. D. Department of Defense. - answerB Uniform Location of Subject Matterprepared by the EJCDC and jointly published by EJCDC and AIA provides a recommended location of topics in all of the following EXCEPT: A. Supplementary Conditions. B. Division 01. C. Agreement. D. Drawings. - answerD During the Planning/Pre-Design stage, the A/E may be retained to: A. Develop outline specifications. B. Describe the character of the mechanical system. C. Prepare renderings. D.Assist in financial feasibility studies - answerD During which project phase does the A/E review the Owner's program and budget requirements and suggest alternative approaches? A. Planning/Pre-Design. B. Design. C. Bidding/Negotiation. D. Construction. E. Post-Construction. - answerB A project's "life cycle" includes all of the following EXCEPT? A. Planning/Design. B. Financing. C. Construction. D. Evaluation. E. Demolition. - answerB nThe Specification-type document prepared during the Design Development phase is called the: A. Outline Specification. B. Rough Draft Specification. C. UniFormat Elements. - answerA nThe contractual relationship governed by the Conditions of the Contract is between: A. Owner and Contractor. B. A/E and Contractor. C. Owner and Subcontractors. D.A/E and Subcontractors. - answerA nThe Agreement: A. Establishes how the contract will be administered. B. Provides for requirements unique to a specific project. C. Protects the labor force if the Contractor fails to meet his obligations. D. Defines relationships and obligations between the Owner and Contractor. - answerD A disadvantage of using standardized agreement forms is: A. Familiarity of the forms. B. Uniformity of terminology. C. Legal precedents interpreting the documents. D. May not meet specific project requirements. E. Recognized customs resulting from longtime use. - answerD nThe "Contract Documents" typically include: A. Contract Forms. B. Contract Drawings. C. Specifications. D. Addenda. E.All of the above. - answerE As part of the _________, the Agreement is considered a Contract Document: A. Contract Conditions. B. Contract Forms. C. Bidding Requirements. D. Specifications. - answerB The Procurement Documents include all of the following EXCEPT: A. Procurement Requirements. B. Contract Modifications. C. Project Manual. D. Drawings. E.Addenda. - answerB All of the following are correct regarding procurement documents EXCEPT: A. Include all necessary procurement requirements. B. May include Owner-supplied bid forms. C. Become part of contract for construction. D. Identify other information available to bidders, such as land surveys. - answerC To be effective in communicating, specifications should be: A. Complete, concise, and correct. B. Concise, clear and correct. C. Clear, correct, complete and concise. D. Concise, correct and complete. - answerC Which of the following wo
Geschreven voor
- Instelling
- CDT
- Vak
- CDT
Documentinformatie
- Geüpload op
- 20 maart 2024
- Aantal pagina's
- 36
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
cdt exam prep 1 4 questions with 100 correct answ
Ook beschikbaar in voordeelbundel