US Army Explosive Safety Familiarization EXAM {QUESTIONS WITH ALL ANSWERS 100% CORRECTLY SOLVED} (2024 / 2025) (Verified by Experts)
Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete an ESSP? - ANSWER Yes, and it requires DDESB approval. As distance from the potential explosion site decreases, the potential for damage to an exposed site from an explosion.... - ANSWER increases. Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division that was not previously approved for that location. Do you need to complete an ESSP? - ANSWER Yes, and it requires DDESB approval. Intraline distance (ILD) is the minimum distance permitted between... - ANSWER two operating buildings
Written for
- Institution
- US Army Explosive Safety Familiarization
- Course
- US Army Explosive Safety Familiarization
Document information
- Uploaded on
- March 18, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
us army explosive safety familiarization
-
your installation is refurbishing an existing pes
-
as distance from the potential explosion site decr
-
your installation is increasing the new for a stor
Document also available in package deal