CMCA PRACTICE EXAM QUESTIONS WITH VERIFIED ANSWERS
CMCA PRACTICE EXAM QUESTIONS WITH VERIFIED ANSWERS Preparing a bid request includes which of the following: A. Verifying References. B. Identifying potential contractors. C. Recommending a contractor to the board. D. Verifying contractor insurance. - ANS B Legal review prior to executing a contract will assist the association in the event that: A. A subcontractor is used. B. A performance bond is required. C. There is a budgetary shortfall. D. The board has questions or concerns. - ANS D Rather than describing the scope of work in detail in the contract, a manager may: A. Attach the bid specifications. B. Call each contractor to describe the job. C. Be on-site to oversee project content. D. Suggest the board meet the contractor to talk about the scope of work. - ANS A In older condominiums, an association should have what type of contract covering mechanical equipment? A. Time and materials B. Specific repair C.Service D. Preventative maintenance - ANS D
Geschreven voor
- Instelling
- CMCA PRACTICE
- Vak
- CMCA PRACTICE
Documentinformatie
- Geüpload op
- 15 maart 2024
- Aantal pagina's
- 5
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
cmca practice exam questions
Ook beschikbaar in voordeelbundel