Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

Resource and Waste Management Questions And Answers With Complete Solutions

Note
-
Vendu
-
Pages
3
Grade
A+
Publié le
15-03-2024
Écrit en
2023/2024

Resources on a construction project - Answer--Products and materials -Construction plant, tools and equipment -Human Resources -Space and facilities -Subcontractors -Finance Why plan for resources - Answer--Ensure resource availability and resolve resource conflicts -Optimise time, effort and cost -Ensure skilled workers are available -Identify limitations e.g site access, weather -reassign resources in response to circumstances -Track resource utilisation to avoid excessive resourcing or under utilisation What is resource management planning (RMP) - Answer--management framework that helps clients to consider and manage key resource efficiency components on projects across its life cycle What does RMP involve - Answer-The flexible process makes use of existing documents and tools to be integrated with environmental management systems -Accessible for projects at different levels of technical detail, type or size and provides evidence for environmental assessment methods such as BREEAM or CEEQUAL. Stages involved with RMP - Answer--Scoping -Action Planning -Estimating -monitoring -Reporting Scoping Stage - Answer-the resource efficiency component is analysed for the whole project so that action can be targeted on all section of the project.Resource efficiency components - Answer--reducing material consumption -waste -Re-use and recycled content -Durability and Life span -Scarcity and Security -Products with low embodied carbon and water -Reducing energy and water in construction -Operational energy and water use Action Planning Stage - Answer--Designer and principal contractor identify actions and performance measures to improve resource efficiency for components defined in the scoping stage. -Lessons from previous projects should be reviewed Monitoring Stage - Answer--Monitoring is carried out for each component by the principal contractor -Client and designer can review at this point and work with the contractor if any changes are required to improve efficiency Reporting Stage - Answer--All members of the construction team should report the performance of the project -This enables lessons to be learned, improve benchmarking and identifying good practice. -Important to how requirements for efficiency are met as well as allow for continual improvement -take lessons forward to new projects Benefits of a site waste management plan - Answer--required on projects over £300k -improve efficiency and profitability by promoting reuse, recycling and recovery of waste rather than disposal -Reduce fly tipping -Increase environmental awareness of your workforce and management Waste Hierarchy - Answer--Reuse -Recycle-Recover -Dispose

Montrer plus Lire moins
Établissement
Resource And Waste Management
Cours
Resource and Waste Management








Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Resource and Waste Management
Cours
Resource and Waste Management

Infos sur le Document

Publié le
15 mars 2024
Nombre de pages
3
Écrit en
2023/2024
Type
Examen
Contient
Questions et réponses

Sujets

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
PatrickKaylian Delaware State University
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
1823
Membre depuis
2 année
Nombre de followers
1044
Documents
22148
Dernière vente
1 jours de cela

3.8

317 revues

5
147
4
60
3
54
2
16
1
40

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions