CESSWI PART 2 QUESTIONS AND ANSWERS A, GUIDE
Existing Veg, Desc/Purp temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. Existing Veg, Objectives 1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang Existing Veg, applic 1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. Existing veg: inspection 1) Accord to regu timetables 2) erosi and damage veg 3) sufficient moisture to ensure growth 4) veg is well stab 5) adequate cover 6) debris and litter 7) invasive exotics Existing veg: maint 1) only disturb area for construct 2)irrigate dry seasons 3) remove see, and replant if need be 4) replant or rework buffer strips 5) mow and cut perennial weeds 6) remove all trash and debri 7) treat invasive and noxious species Sched/Sequ, purp/descrip Temp, procedural control that involves creating a written plan to address neck bmps and sequencing of construct activities to mitigate the erosive effects of wind,water and construct activities. Sched/Sequ: object 1) site planning & management 2) erosion control 3) sediment control Sched/Sequ: applications 1) develop timetables for certain activities, paretic during rainy season Sched/Sequ: inspect 1) inclusion of sched/seq as a bmp in the plan 2) ached site activities mirroring ached activites. Sched/Sequ: maintanence 1) modify ached of active when changes are warranted 2) modify ached of active prior to rainy season to reflect updated bmp info
Written for
- Institution
- Cesswi part 2
- Course
- Cesswi part 2
Document information
- Uploaded on
- March 13, 2024
- Number of pages
- 41
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
existing veg descpurptemp or perm bmp desi to s
Also available in package deal