LP Gas Master Qualifier: Bulk Plants Questions With Complete Solutions.
Bulk storage containers are to be equipped with which of the following? a. Pressure gauge b. Liquid Level gauge c. Relief valve d. All of the above - Answer-D. All of the above Remote Shutdown Stations (ESV'S): Plant ESV located not less than ______ ft. and not more than _____ ft. from point of transfer. a. 20ft - 50ft b. 25ft - 75ft c. 25ft - 100ft d. 50ft - 100ft - Answer-c. 25ft - 100ft Correct color-coding of piping: 30 inches from a valve ______for liquid piping and ______ for vapor piping. a. Pink and Blue b. Green and Orange c. Black and White d. Red and Yellow - Answer-d. Red and Yellow Each industrial plant, bulk plant, and distributing point shall be provided with at least one portable fire extinguisher in accordance with section 4.7 having a minimum capacity of ____ lb. of dry chemical a. 10 b. 12 c. 18 d. 30 - Answer-c. 18Facilities shall be enclosed with at least a _____ ft high industrial type fence, chain link or equivalent protection. a. 4 b. 6 c. 8 d. 10 - Answer-b. 6 A pressure relief device installed in the piping which liquid could be isolated between shutoff valves is called a __________. a. Globe Valve b. Hydrostatic relief valve c. Back flow valve d. Excess flow valve - Answer-b. Hydrostatic relief valve
École, étude et sujet
- Établissement
- LP Gas Master Qualifier: Bulk Plants
- Cours
- LP Gas Master Qualifier: Bulk Plants
Infos sur le Document
- Publié le
- 13 mars 2024
- Nombre de pages
- 3
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
lp gas master qualifier bulk plants
Document également disponible en groupe