CDT 2024 EXAM QUESTIONS AND DETAILED ANSWERS| A+ GRADE

Note
-
Vendu
-
Pages
23
Grade
A+
Publié le
11-03-2024
Écrit en
2023/2024

CDT 2024 EXAM QUESTIONS AND DETAILED ANSWERS| A+ GRADE

Établissement
Cours










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Cours

Infos sur le Document

Publié le
11 mars 2024
Nombre de pages
23
Écrit en
2023/2024
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CDT 2024 EXAM QUESTIONS AND
DETAILED ANSWERS| A+ GRADE

1. The method of computation of Contractor's overhead and
profits for Change Order prices, where both additions and
deletions are involved, is found in the:
a) Agreement.
b) Conditions of the Contract.
c) Division 01.
d) Instructions to Bidders. Correct Answer b) Conditions of the
Contract.

2. General Requirements are part of:
a) Supplementary Conditions.
b) Bidding Requirements.
c) Specifications.
d) Summary of Work. Correct Answer c) Specifications.

3. The three essential considerations in the evaluation of a
product are:
a) Requirements, Criteria, and Tests.
b) Costs, Maintenance, and Installation.
c) Life Cycle Cost, Installation Cost, and Maintenance Cost.
d) Case studies, Failures, and Problems. Correct Answer a)
Requirements, Criteria, and Tests.

4. Whose responsibility is it to furnish the Shop Drawings?
a) The Architect/Engineer
b) The Contractor
c) The Owner
d) The Subcontractor Correct Answer b) The Contractor

5. The division of the Work among multiple prime Contracts is
described in:
a) Instructions to Bidders.

,b) Supplementary Conditions.
c) Division 01.
d) Special Conditions. Correct Answer c) Division 01.

6. During the Project Conception Stage, the A/E may be
retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
c) Prepare renderings
d) Assist in financial feasibility studies Correct Answer d) Assist
in financial feasibility studies

7. What is the main purpose of MasterFormat?
a) for scheduling, value management, recording of design data
and managing costs.
b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and
detailed cost estimates.
d) when there is a standardized need for information to appear
upon each page of a project manual. Correct Answer c) to
organize the Project Manual, reference keynotes and detailed
cost estimates.

8. The person who becomes secondarily liable for another's
debt or performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee Correct Answer c) Guarantor

9. Integrated projects are distinguished by all of the following
characteristics except:
a) Development of virtual project model through input from a
collaborative team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and
construction

, d) "Just as needed" team involvement to reduce owner's pre-
construction expenses Correct Answer d) "Just as needed"
team involvement to reduce owner's pre-construction expenses

10. Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E Correct Answer b) Divisions 01-
49

11. An example of a MasterFormat Level 3 specification
Section is:
a) 05 00 00 Metals.
b) 05 20 00 Metal Joists.
c) 05 21 00 Steel Joist Framing.
d) 05 21 19 Open Web Steel Joist Framing. Correct Answer d)
05 21 19 Open Web Steel Joist Framing.

12. What activities take place in the Project Conception Stage?
a) The engineers develop the mechanical and electrical
systems.
b) The site is selected and the demolition is done.
c) Feasibility studies and budget is set.
d) The program is evaluated and the engineers are selected.
Correct Answer c) Feasibility studies and budget is set.

13. The document recommended to organize preliminary
construction information into a standard order on the basis of
systems and assemblies is:
a) MasterFormat
b) Uniformat
c) Outline Specifications
d) Project Manual Correct Answer b) Uniformat

14. All design and construction drawings can be classified as
one of two types of views:
$21.99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Tutorkev Teachme2-tutor
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
112
Membre depuis
1 année
Nombre de followers
50
Documents
462
Dernière vente
1 mois de cela
TUTOR KEV

Your upcoming test doesn\'t have to keep you awake any longer. Find the highest of quality Exams,summaries and study guides with latest questions and detailed answers with rationales to assist you prepare for the oncoming tests.

4.5

36 revues

5
28
4
5
3
0
2
0
1
3

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions