ACI Flatwork Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
It is important that the ____________ __________ read and understand project specifications. - finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - 100 Concrete is sold by the ton? - False Delays in discharging concrete trucks can result in the concrete being hard to: - pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster because: - as one truck is finishing, the other is ready to unload the concrete Concrete from a ready mix truck must usually be completely discharged within _____ hours after water has been added at the plant. - 1.5 You can tell when water has been added to the concrete truck by looking at the: - batch ticket
École, étude et sujet
- Établissement
- ACI Flatwork
- Cours
- ACI Flatwork
Infos sur le Document
- Publié le
- 8 mars 2024
- Nombre de pages
- 9
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
aci flatwork questions answers 100 correct an
Document également disponible en groupe