100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

UST Inspector Quiz 2024 Graded A/Actual test solved correctly

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
03-03-2024
Written in
2023/2024

UST Inspector Quiz 2024 Graded A/Actual test solved correctly How long does an owner have to fix a significant violation that does not pose an imminent threat to human health and safety or environment before being issued a red tag? a) 24 hours b) 48 hours c) 7 days d) 30 days - Answer ️️ -c) 7 days; CCR 2717.1(b) Which one of the following can perform ELD? a) licensed tank tester b) licensed state contractor c) ICC certified service technician d) Professional Engineer - Answer ️️ -a) licensed tank tester; CCR2644.1 and 2643(f); HSC 25484.4 Which one contains the requirements for installing, repairing, and monitoring UST's? a) Health and Safety Code Chapter 6.7 b) Fire Code ABCD c) California Code of Regulations Chapter 16, Title 22 d) Code of Federal Regulations, 29 Chapter 6 - Answer ️️ -a) HSC Chapter 6.7 and CCR Title 23 A monitoring system certification includes all of the following EXCEPT a) submittal of a completed Monitoring System Certification form b) pre-notification to the local agency of scheduled Monitoring System Certification date c) affixing a tag/sticker to each monitoring equipment component that is certified, repaired, or replaced d) posting the Monitoring System Certification from a visible location at the UST facility - Answer ️️ -d) posting the Monitoring System Certification from a visible location at the UST facility; CCR 2638 Which of the following is not a valid overfill prevention method? a) Spill bucket b) ATG with audible/visual alarm c) Ball float valve d) Flapper valve - Answer ️️ -a) Spill bucket; CCR 2635(b)(2) What is the purpose of interstitial monitoring? a) to detect leaks in the UDC's b) to detect the presence of fluid between the primary and secondary containment c) to monitor tank volume d) to regulate fuel flow to the dispenser - Answer ️️ -b) to detect the presence of fluid between the primary and secondary containment; CCR 2611 If a release has occurred from a single-walled tank, may the tank be lined? a) No, not if a release has occurred b) Yes, if it has been lined before c) Yes, if the tank owner can demonstrate it will provide continued containment d) Yes, if the tank is less than 10,000 gallons - Answer ️️ -c) Yes, if the tank owner can demonstrate it will provide continued containment; CCR 2660(k), HSC 25296 A tank may be repaired in the following manner: a) using a 12" x 12" fiberglass cloth centered on the repair b) using tank manufacturer approved epoxy or resin c) with self tapping bolts d) all of the above - Answer ️️ -d) all of the above; CCR 2661 Which of the following is not a confined space? a) space not designed for continuous employee occupancy b) area with limited access c) area with limited ventilation d) really deep turbine sump - Answer ️️ -c) area with limited ventilation; CCR Title 8, 5157(b) Where is a red tag applied? a) on the turbine head b) on the fill tube c) on the dispenser hose d) on the cash register - Answer ️️ -b) on the fill tube; CCR 2717.1(a) What must pressurized piping systems have installed by November 9, 2004 a) double walled spill buckets b) hydro statically lined UDC's c) line leak detectors d) automatic tank gauging - Answer ️️ -c) line leak detectors; CCR 2636 (f)(2) The local agency inspectors shall renew the ICC certification? a) by passing the inspector exam or equivalent approved criteria b) every 36 months c) via correspondence course d) there is no renewal required - Answer ️️ -a) by passing the inspector exam or equivalent approved criteria; CCR 2715(j) A tank system under temporary closure must be inspected at what interval? a) monthly b) every 3 months c) every 6 months d) annualy - Answer ️️ -b) every 3 months; CCR 2671(c) UST system includes what components a) tank only b) piping only c) tank, associated piping and ancillary equipment d) tank, piping, dispensing units, and nozzles - Answer ️️ -c) tank, associated piping and ancillary equipment; HSC 2528

Show more Read less
Institution
UST
Course
UST









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
UST
Course
UST

Document information

Uploaded on
March 3, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
449
Member since
2 year
Number of followers
138
Documents
21614
Last sold
1 day ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

98 reviews

5
46
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions