ACI Concrete Field Testing Technician- Grade I Exam Questions And Answers 100% Verified
ACI Concrete Field Testing Technician- Grade I Exam Questions And Answers 100% Verified The temperature of concrete may be measured in a wall form. True or False - answerTrue The sensor of the temperature measuring device shall be submerged a minimum of _____ in. into the freshly mixed concrete. - answer3 in. Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True or False? - answerTrue The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - answer1 degree F, 30 degrees F to 120 F The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - answerAnnually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - answerTrue A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False? - answerFalse What must be done to the sample container prior to sampling the concrete? - answerDampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - answerGently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - answerAt least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - answerReporting of temperature The temperature of concrete is reported to the nearest _____ degrees F - answer1 degree F According to ASTM C1064, what is one reason to take the temperature of concrete? - answerVerify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - answerFalse This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - answerStationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - answer15 The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - answer5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - answer15 The concrete sample must be protected from sources of _____ and _____. - answercontamination and rapid evaporati
Written for
- Institution
- ACI Concrete
- Course
- ACI Concrete
Document information
- Uploaded on
- February 23, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i exa
Also available in package deal