100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Michigan Builders License Exam Questions With Correct Answers Latest Update 2024/2025 | 100% SOLVED

Rating
-
Sold
-
Pages
59
Grade
A+
Uploaded on
21-02-2024
Written in
2023/2024

Michigan Builders License Exam Questions With Correct Answers Latest Update 2024/2025 | 100% SOLVED. Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Correct Answer-IRC (International Residential Code) Administrative - Correct Answer-First 2 chapters of code book are True - Correct Answer-Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Correct Answer-Does the building official have the authority to render interpretations of the code? 8 foot fence. - Correct Answer-None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False - Correct Answer-Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. - Correct Answer-The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. - Correct Answer-If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. - Correct Answer-Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. - Correct Answer-Generally speaking, the building official's job is to True. - Correct Answer-It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. - Correct Answer-All of the following are not considered habitable spaces EXCEPT: bathrooms Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025 kitchens storage spaces closets 3. - Correct Answer-Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. 44 inches. - Correct Answer-The maximum height of an egress window above the floor is 5.7 sq ft. - Correct Answer-A basement bedroom must have an egress window with a clear opening of at least ______ square feet. 3. - Correct Answer-At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. 30 inches. - Correct Answer-A porch more than _____ inches above grade must be provided with 36" guards. 200. - Correct Answer-Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . 7 days. - Correct Answer-According to code, concrete must reach at least 70% of it's ability within ____________days. 40%. - Correct Answer-A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. Additions, alterations, renovation and repairs. - Correct Answer-The Michigan Uniform Energy code applies to new buildings as well as U-factor. - Correct Answer-___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. 50%. - Correct Answer-Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. R-3. - Correct Answer-Michigan requires a minimum thermal resistance of ____________for mechanical system piping. True. - Correct Answer-Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F Prescriptive Path. - Correct Answer-_______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. Area weighted averages. - Correct Answer-___________ can be used to satisfy Ufactor and SHGC requirements. IC (Insulation Contact) - Correct Answer-Recessed lights must be _____ rated. True. - Correct Answer-Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. - Correct Answer-The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. - Correct Answer-One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. - Correct Answer-Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name - Correct Answer-Insulation products (blown and sprayed) must be documented with: March 2011. - Correct Answer-The new Michigan codes took effect in 10. - Correct Answer-Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. - Correct Answer-The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems - Correct Answer-Plans and specifications must be detailed in regards to: 2009. - Correct Answer-In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. - Correct Answer-___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights - Correct Answer-Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC - Correct Answer-R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code - Correct Answer-IECC U-factor and UA alternatives. - Correct Answer-The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet - Correct Answer-R-30 is permitted in vaulted ceilings, but is limited to True. - Correct Answer-Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. - Correct Answer-Michigan falls into climate zones False. - Correct Answer-It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) - Correct Answer-__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. - Correct Answer-According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. - Correct Answer-Attic insulation markers must be installed every _____ square feet. True. - Correct Answer-Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F Yes. - Correct Answer-A contractor needs to remove a non-load bearing wall, does he need to pull a permit? No. - Correct Answer-A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? Yes. - Correct Answer-A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? Health department. - Correct Answer-Who issues a well and septic permit? 200 sq. feet. IRC R105 - Correct Answer-Permits are not required for one story detached accessory structures not exceeding: The next business day. - Correct Answer-If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. - Correct Answer-If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 - Correct Answer-Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. - Correct Answer-An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit?

Show more Read less
Institution
Michigan Builders License
Course
Michigan builders license











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Michigan builders license
Course
Michigan builders license

Document information

Uploaded on
February 21, 2024
Number of pages
59
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcelAcademia2026 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2066
Member since
4 year
Number of followers
1649
Documents
7579
Last sold
12 hours ago
EXCEL ACADEMIA TUTORS

At Excel Academia Tutoring, You will get solutions to all subjects in both assignments and major exams. Contact me for assistance. Good luck! Well-researched education materials for you. Expert in Nursing, Mathematics, Psychology, Biology etc. My Work has the Latest & Updated Exam Solutions, Study Guides and Notes (100% Verified Solutions that Guarantee Success)

3.7

339 reviews

5
139
4
75
3
62
2
20
1
43

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions