NERC Standards| Questions| with complete solutions 100% VERIFIED 2024
NERC Standards| Questions| with complete solutions 100% VERIFIED 2024 How Many Active Standards are in BAL (Resource and Demand Balancing) - answerThere are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enforcement BAL-002-WECC-2a Contingency Reserve Related Information Subject to Enforcement BAL-003-1.1 Frequency Response and Frequency Bias Setting Related Information Subject to Enforcement BAL-004-WECC-3 Automatic Time Error Correction R elated Information Subject to Enforcement BAL-005-1 Balancing Authority Control Related Information Subject to Enforcement BAL-502-RF-03 Planning Resource Adequacy Analysis, Assessment and Documentation Related Information Subject to Enforcement BAL-001-2: Real Power Balancing Control Performance - answerTo control Interconnection frequency within defined limits. (2 Requirements) BAL-001-2: Real Power Balancing Control Performance R1 - answerR1. The Responsible Entity shall operate such that the Control Performance Standard 1 (CPS1), calculated in accordance with Attachment 1, is greater than or equal to 100 percent for the applicable Interconnection in which it operates for each preceding 12 consecutive calendar month period, evaluated monthly. [Violation Risk Factor: Medium] [Time Horizon: Real-time Operations] BAL-001-2: Real Power Balancing Control Performance R2 - answerR2. Each Balancing Authority shall operate such that its clock-minute average of Reporting ACE does not exceed its clock-minute Balancing Authority ACE Limit (BAAL) for more than 30 consecutive clock- minutes, calculated in accordance with Attachment 2, for the applicable Interconnection in which the Balancing Authority operates.[Violation Risk Factor: Medium] [Time Horizon: Real-time Operations] BAL-001-TRE-1: Primary Frequency Response in the ERCOT Region - answerTo maintain Interconnection steady-state frequency within defined limits. Contingency Reserve Restoration Period - answerA period not exceeding 90 minutes following the end of the Contingency Event Recovery Period. BAL-001-TRE-1: R1 Primary Frequency Response in the ERCOT Region - answerR2. The BA shall calculate the Primary Frequency Response of each generating unit/generating facility in accordance with this standard and the Primary Frequency Response Reference Document.1 This calculation shall provide a 12-month rolling average of initial and sustained Primary Frequency Response performance. This calculation shall be completed each month for the preceding 12 calendar months. 2.1. The performance of a combined cycle facility will be determined using an expected performance droop of 5.78%. 2.2. The calculation results shall be submitted to the Compliance Enforcement Authority and made available to the GO by the end of the month in which they were completed. 2.3. If a generating unit/generating facility has not participated in a minimum of (8) eight FMEs in a 12-month period, its performance shall be based on a rolling eight FME average response. [Violation Risk Factor = Lower] [Time Horizon = Operations Assessment] M2. The BA shall have evidence it calculated and reported the rolling average initial and sustained Primary Frequency Response performance of each generating unit/generating facility monthly as required in Requirement R2. BAL-001-TRE-1: R3 Primary Frequency Response in the ERCOT Region - answerR3. The BA shall determine the Interconnection minimum Frequency Response (IMFR) in December of each year for the following year, and make the IMFR, the methodology for calculation and the criteria for determination of the IMFR publicly available. BAL-002-3: Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event - answerTo ensure the Balancing Authority or Reserve Sharing Group balances resources and
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- February 14, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc standards questions with complete solutions