ACG CxA 31 Questions with 100% Correct Answers | Verified | Latest Update
1. Owner 2. End user 3. architect 4. electrical engineer 5. mechanical engineer 6. commissioning authority 7. controls contractor 8. mechanical contractor 9. electrical contractor 10. sheet metal contractor 11. TAB agency 12. General or construction manager 13. owners O&M staff - ️️Identify typical team member of the Cx Team. 1. commissioning starts at the inception of a building project during the pre-design phase, and continues through the post-acceptance phase. 2. provides an opportunity to cultivate a quality management focus among all design and construction team members as they become involved with the project - ️️Comprehensive Commissioning Chapter 5 - ️️Which Chapter of the ACG guideline identifies detailed methodology for Comprehensive HVAC Commissioning? Pre-design Design
Written for
- Institution
- ACG CxA
- Course
- ACG CxA
Document information
- Uploaded on
- February 11, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal