CHST Exam 2024 Questions and Answers 100% Accurate(RATED A+)
When must a handrail be added to stairwell? - ANSWER-When it is 30 inches or one having four or more risers. What are four concerns a CHST must address regarding unsafe use of ladders and stairwells? - ANSWER-Slippery conditions, handrails on specific types, not used for storage and examined for weak structure. Specifications state that scaffolding must be of sufficent strength to hold more than how many times its specified weight? - ANSWER-4 times. How often should ropes and rigging in suspension scaffolding be inspected for damage? - ANSWER-At the beginning and during each shift. How far from electrical power lines must a scaffold be? - ANSWER-10 feet What are three things scaffolds must have? - ANSWER-Toe boards, guardrails and mid rails. How many catagories does an MSDS have? - ANSWER-16 What is the cheif concern in choosing the appropriate respirator? - ANSWER-Material hazards presented by the worksite. What type of respirator is not good for workers with asthma? - ANSWER-Negative pressure. Workers medical conditions are factors in choosing respirators. What are the three main factors to consider when choosing respirators? - ANSWER-1. The physical configuration of the jobsite. 2. The workers medical conditions. 3. Worker comfort. What does MFF stand for? - ANSWER-Metal Fume Fever. What are the symptoms of MFF? - ANSWER-Resemble classical flu symptoms. Welders who work with hat tend to have higher incidence of MFF? - ANSWER-Zinc Oxides What can prevent MFF? - ANSWER-Welders to wear respirators and local or exhaust ventilation can effect nearby workers. What are the safe operating procedures pertaining to utlility and service lines when a building is being prepared for demolitions. - ANSWER-1. Conduct survey inspection. 2. Document specific hazards. 3. Evaluate utility functions servicing the building. What utlilties must be cute before demolition begins? - ANSWER-Electric, water, gas, sewer and any other service. What should the survey report include for demolition? - ANSWER-Whether there are dangers posed to workers or the environment like chemicals, gases, explosives, flammables or other hazardous materials in storage tanks. When can materials be dropped through floor openings? - ANSWER-When the drop area is completely enclosed and barricaded. Barricades must be at least 42 inches high and no closer to the drop area than 6 feet. From which height must a chute be used when removing waste form upper levels of buildings? - ANSWER-20 feet. The chute can be made of wood, alloyed metal and must be securely anchored. Should glass windows be removed before demolition? - ANSWER-YEs, when there are concerns for workers being cut by broken glass. What d
Written for
- Institution
- CHST
- Course
- CHST
Document information
- Uploaded on
- January 30, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
chst exam 2024 questions and answers 100 accurate
-
chst exam 2024 questions and answers stuvia
-
when must a handrail be added to stairwell answ
-
what are four concerns a chst must address regardi
Also available in package deal