NERC Certification Practice Questions and Answers(RATED A+)
Which of the following represents a virtual tie-line updated in real time? - ANSWER pseudo-tie Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential generation deficiencies each: - ANSWER day Balancing authorities that share jointly owned generation must include their share of the unit governor droop response into their respective frequency bias setting if the energy is scheduled as a: - ANSWER dynamic schedule A balancing authority's frequency bias contribution is 30 MW / 0.1 Hz. What is the balancing authority's frequency response due to the external loss of 1,000 MW generator which causes system frequency to decline to 59.95 Hz? - ANSWER 15 MW A system operator experiences a system failure of AGC and ACE functions. The operator's first priority should be to: - ANSWER manually calculate ACE and adjust generation to maintain scheduled interchange Interruptible loads may be dispatched to alleviate: - ANSWER capacity deficiency Telecommunication facilities that link with
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 23, 2024
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc certification practice questions and answers
-
nerc certification practice stuvia 2023
-
which of the following represents a virtual tie l
Also available in package deal