Exam (elaborations)
SLOFD 12 Month Test | 365 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Course
- Institution
How is a "wet line" accomplished? - By dropping off the FF with hose and hydrant bag at the hydrant. After placing the hydrant strap over the hydrant, find the Engineer in the mirror and give both verbal and visual signals to "____________________." - Lay line After the apparatus has laid at lea...
[Show more]